My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-14_REVISION - M1992009
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992009
>
2014-02-14_REVISION - M1992009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:25:32 PM
Creation date
2/14/2014 3:46:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992009
IBM Index Class Name
REVISION
Doc Date
2/14/2014
Doc Name
Technical revision receipt and adequacy review TR06
From
DRMS
To
Gillette Sand and Gravel, Inc.
Type & Sequence
TR6
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />Task description: Mob /Demob Loader <br />Site: Gillette Pit Permit Action: TR06 Permit /Job #: M 1992009 <br />PROJECT IDENTIFICATION <br />Task #: T64 State: Colorado _ Abbreviation: None <br />Date: 2/14/2014 County: Teller Filename: M009 -T64 <br />User: TC1 -- - -- - - - - - -- -- -- <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Shift basis: _ 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />Ownership Cost /Hour: <br />-- <br />_ 0 -2.5 Tons <br />$16.63 <br />- - - <br />26 -50 Tons <br />$18.37 <br />51+ Tons <br />_ <br />$22.33 <br />Operating Cost /Hour: <br />$44.38 <br />$27.66 <br />- -- <br />$46.13 _ <br />$27.66 <br />- _- - <br />$50.07 <br />$27.66 <br />Operator Cost/Hour: <br />Helper Cost /Hour: <br />$0.00 <br />$25.39 <br />$25.3_9 <br />Total Unit Cost /Hour: <br />$88.67 <br />� $117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br />Description Unit Cost /hr/ unit Cost /hr /unit Size Cost /hr/ Cost /hr/ fleet Cost/ fleet <br />- - - - (TONS) — -- -- fleet <br />CAT 96211 20.95 $25.86 $88.67 - 1 $114.53 $88.67 - $250.00 <br />Subtotals $114.53 T $88.67 250.00 - <br />ROADABLE EQUIPMENT: <br />Machine Description <br />-- - - - - -- - - - -- - ----- - - - - -- -- -- - <br />Total Cost /hr/ unit Fleet Size Haul Trip Return Trip <br />Cost /hr/ fleet i Cost /lu•/ fleet l <br />Subtotals: $0.00 $0.00 <br />- —� --- -- <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.