Laserfiche WebLink
Truck/Loadcr Workshect Cont'd <br />Task # T63 <br />Page 3 of 3 <br />Haul Route: <br />Seg # Haul Distance Grade (`Yo) <br />Roll. Res Tota] Res <br />I Velocity <br />Travel <br />(Ft) <br />( %) (%) <br />(fpm) <br />Time <br />nun <br />L 1 279840.00_ -1.25 <br />1.20 -0.05 <br />2938 <br />98.194 <br />Haul Time: <br />98.194 <br />minutes <br />Return Route: <br />Haul Distance Grade ( %) Roll. Res Tota] Re --s Velocity Travel <br />(Ft) (fpm) Time <br />1 1 279840.00 1.25 ] .20 2.45 2905 96.366 <br />Return Time: 9_6.366 minutes <br />Total Truck Cycle Time: 198.103 minutes <br />Loading Tool unit <br />Production 406.91 LCY /Hour <br />Truck Unit Production <br />5.37 <br />Optimal No. of Trucks: 76 <br />LCY/Hour <br />Adjusted for job efficiency: <br />Adjusted for job efficiency: <br />337.73 LCY /Hour <br />4.46 LCY /Hour <br />Truck(s) Selected Number of Tricks: 1 Truck(s) <br />Adjusted hourly trick team production: 4.46 LCY/Hour <br />Adjusted single truck/loader team production: 4.46 LCY /Hour <br />Adjusted multiple truck /loader team production: 4.46 LCY /Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $49.638 /LCY <br />Total job time: 2.98 Hours <br />Total job cost: $694.93 <br />CIRCES Cost Estimating Software <br />