Laserfiche WebLink
Truck /Loader Worksheet Cont'd Task # T63 <br />Truck Bed (volume) Basis <br />Struck Volume: <br />12.00 <br />LCY <br />Heaped Volume: <br />18.00 <br />LCY <br />Average Volume: <br />15.00 <br />LCY <br />Adjusted Volume: <br />18.00 <br />LCY <br />Loading Tool Capacity <br />Final Truck Volume Based on Number of Loader Passes: 17.74 <br />Bucket Size Class: NA <br />Rated Capacity: - 4.300 <br />LCY (heaped) <br />Bucket Fill Factor: 0.825 - <br />Blasted rock <br />_ <br />- avg. blasted_ (75-- 90 %) 0.825 <br />Adjusted Capacity: 3.548 <br />LCY <br />Job Condition Corrections: <br />Site Altitude (ft.): 9950 feet <br />Truck <br />Loader <br />Source <br />- Altitude Adj_� <br />0.970 <br />_ <br />1.000 - <br />_ (CAT HB) <br />Job Efficiencyt <br />- 0.830 <br />0.830_- <br />- -- <br />- <br />(CAT HB) <br />- — <br />Net Correction: <br />0.805 <br />L 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders -- Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA <br />Dump: 0.100 <br />Pagc 2 of 3 <br />LCY <br />5 passes <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle 'Time (load, dump, maneuver): 0.500 minutes <br />--Cycle Time Factors - Factor (min.) Source <br />Material: Bank or broken material 0A4 0.040 (Cat HB) <br />_ Stockpile: No adjustment - factor not applicable 0_00 - 0.000 (Cat HB) <br />Truck Ownership: Common ownership of trucks and _loaders -0.04 - 0.04_0_ (Cat HB) <br />- Operation: No adjustment - factor not applicable 0.00 - - 0.000_ (Cat HB) <br />- Dump Target_ No adjustment - factor not applicable 0.0_0 - 0.000 _ (Cat HB) <br />Net Cycle Time Adjustment: 0.000 minutes <br />Adjusted Loader Cycle Time: 0.500 minutes <br />Net Load Time per Truck: 2.100 minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.515 Minutes <br />Truck Load Time: 2.100 Minutes Adjusted for site altitude: 2.100 Minutes <br />Truck Maneuver and Dump Time: 0.90 Minutes Adjusted for site altitude: 0.928 Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Very hard, smooth, asphalt or concrete no tire <br />penetration 1.2 <br />CIRCES Cost Estimating Software <br />