My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-14_REVISION - M1992009
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992009
>
2014-02-14_REVISION - M1992009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:25:32 PM
Creation date
2/14/2014 3:46:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992009
IBM Index Class Name
REVISION
Doc Date
2/14/2014
Doc Name
Technical revision receipt and adequacy review TR06
From
DRMS
To
Gillette Sand and Gravel, Inc.
Type & Sequence
TR6
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page I of 3 <br />UCK/LOADER TEAM WORK <br />Task description: -Transport 14 to -18 CY cone. rubble offsite <br />Site: Gillette Pit Permit Action: 7806 Permit /Job#: M1992009 <br />PROJECT IDENTIFICATION <br />Task #: T63 _ _ State: Colorado_ Abbreviation: None <br />Date: 2/14/2014 Teller_ Filename: M009 -T63 <br />User: TC 1 <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: <br />_ - Loader: <br />Support Equipment -Load Area: <br />-Dump-Area: <br />Road Maintenance -Motor Grader: <br />-Water-Truck: <br />Shift basis: 1_ per <br />Equipment Description _ <br />Generic 12-18 cy, 6x4 <br />CAT 962H - -- - -- - - <br />CAT 962H <br />NA <br />NA <br />NA <br />Cost Breakdown: <br />Truck /Loader Tea_m__ <br />Maintenance <br />Truck <br />Loader <br />%oUtilization- machine: <br />95 <br />15 <br />Ownership cost /hour: <br />$14.43 <br />$25.86 <br />Operating cost /hour: <br />$62.63 <br />$6.89 <br />Ripper op. cost /hour: <br />NA <br />$0.00 <br />Operator cost /hour: <br />$25.66 <br />$35.82 <br />Unit Subtotals: <br />$102.73 <br />$68.57 <br />Number of Units: <br />1 <br />1 <br />LGroup Subtotals: <br />Work: --$-1-71.3-0 <br />Total work team cost <br />/hour: $232.98 <br />NA <br />MATERIAL OUANTITIES <br />Support <br />Equipment <br />Maintenance <br />Equipment <br />Load Area <br />Dump Area <br />Motor Grader <br />( Water Truck <br />0 <br />NA <br />NA <br />NA <br />$25.86 <br />NA <br />NA <br />NA <br />$0.00 <br />-- -$0.00 <br />NA <br />NA <br />NA <br />_ <br />Description: User Provided <br />- NA -- - <br />- -- NA - <br />- - NA <br />$35.82 <br />— -- <br />NA <br />- - -- <br />NA <br />NA <br />$61.68 <br />NA <br />NA <br />NA <br />- 1 - - <br />`- <br />U- <br />�- <br />Support: <br />- -0 - <br />$61.68 <br />-- -- - <br />- Maint_ <br />- - <br />$0.00 <br />Initial volume: 14 <br />CCY Swell factor: 1.000 <br />Loose volume: 14 <br />LCY <br />Source of estimated volume: <br />- Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: <br />Cat Handbook_ <br />Material Purchase Cost: <br />$0.00 <br />Total Cost: <br />$0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 120 <br />Pounds /LCY <br />_ <br />Description: User Provided <br />Rated Payload: 50,300 <br />Pounds <br />_ _ <br />Payload Capacity: 419.17 <br />_ <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.