Laserfiche WebLink
MISCELLANEOUS TRUCK WORK <br />Task description: Transport 6T steel offsite <br />Site: Gillette Pit Permit Action: TR06 <br />PROJECT IDENTIFICATION <br />Task #: T62 State: Colorado _ <br />Date: - 2/14/_2014- County: Teller ___ _ <br />User: TCl <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Make and Model: Flatbed Truck, 6x_ 4, 45K G_VW <br />Attachment 1: <br />Attachment 2: <br />Labor Unit 1: Flatbed Driver - 2+ rear axles <br />Labor Unit 2: <br />Cost Breakdown: <br />Ownership Cost /Hour: <br />Operating Cost /Hour: <br />Operator Cost /Hour: <br />Total Unit Cost /Hour: <br />Total Fleet Cost /Hour: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $77.12 <br />j Utilization % <br />$11.37 NA <br />$44.24 100 <br />$21.51 NA <br />- $77.12 - - -- - -- — <br />$77.12--- - <br />Perinit /Job #: M1992009 <br />Abbreviation: _ None_ <br />Filename: M009 -T62 <br />_ Horsepower: <br />Shift Basis: <br />Weight: <br />Truck(s) Total job time: 8.00 <br />/Hour Total job cost: $617.00 <br />_ 380 <br />1 per day <br />7.50 _ <br />(US Tons) <br />Hours <br />CIRCES Cost Estimating Software <br />