Laserfiche WebLink
Mobilization Worksheet Cont'd Task # T64 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: WOODLAND PARK <br />Total one -way travel distance: 20.00 miles <br />Average Travel Speed: 40.00 mph <br />Total Non - Roadable Mob /Demob Cost $817.73 <br />two round trips with haul rig: <br />Total Roadable Mob /Demob Cost $0.00 <br />one round trip, no haul rig: <br />Transportation Cycle Time. <br />Non - Roadable Roadable <br />Equipment <br />Equipment <br />Haul Time (Hours): 0.50 0.50 <br />Return Time (Hours): 0.50 0.50 <br />Loading Time (Hours): 0.25 <br />Unloading Time (Hours): 0.25 <br />Subtotals: 1.50 <br />JOB TIME AND COST <br />NA <br />Total job time: 100 Hours <br />Total job cost: $817.73 <br />CIRCES Cost Estimating Software <br />