Laserfiche WebLink
be without substance. However, WFC will fix any areas where water is held in a <br />depression and does not achieve positive flow through. Re- discing and re- leveling the <br />entire property, as Ward seems to want, is not warranted and would delay bond release. <br />Third Item of Discussion. <br />Ward said they now have the contract with Garvey's to harvest the hay off of the <br />WFC /Garvey reclaimed land. Burbridge is now agreeable to allow cutting sooner than <br />the June 20`h —July 4th date proposed only a day or so ago. <br />Kent Crofts, the vegetation guy is scheduled to tour the reclaimed field today, June 6th to <br />see if the fields are ready. Kent can possible start sooner than the 20th, providing he gets <br />approval and all that stuff from Sandy Brown and DRMS. <br />100056831.2 } <br />