Laserfiche WebLink
Susan Burgmaier -S- February 7, 2014 <br />120'; page 11 of Volume XI states that the Buckhorn report confirms stability of Gob <br />Pile #3 to a height of 110'. Please revise the text on page 4 to indicate a <br />maximum pile height of 110' for Gob Pile #3, consistent with the Buckhorn <br />report, (Rule 4.10.4(2)) <br />BOW2: Please see revised Volume XI page 4. Maximum height shall be 122'. <br />18. DRMS: Based on the summary of revised pages, it appears that pages 4a and 4b <br />of the currently approved Volume XI will be retained; at this time these pages are <br />pertinent information that should be retained. Please verify thatpages 4a and 4b <br />of Volume XI will be retained with TR -84, <br />BOW2: Pages 4a and 4b will be retained. They were not revised so they were not <br />included in the submitted pages. <br />19. DRMS: Page 5 of Volume XI indicates that Pond J has been sized to contain <br />approximately 4.0 acre feet of water and 0.5 acre feet of sediment. This appears to be <br />in conflict with the Pond J Capacities table on the right edge of Map 22J, that says the <br />As -Built Capacity for water is 2.68 ac ft and sediment is 0.91 ac ft. Pleasereviewand <br />correct page 5 of Volume XI so that the stated capacities of Pond J are <br />consistent with Map 22J, <br />BOW2: The "as- built" information is confusing, and has been removed. Instead, the <br />capacities listed are now for the designed, and required configuration of Pond J. Please <br />see revised Map 223 and page 5. <br />20. DRMS: Paragraph 2 of the Inspection section, on page 9 of Volume XI, refers to <br />underdrains being covered with "excess spoil ". A term such as "coverfill" may be more <br />accurate here. Please review the use of the term "excess spoil "in paragraph 2 <br />of page 9 of Volume XI and revise, if appropriate. <br />BOW2: Please see revised page 9. <br />21. DRMS: BRL has provided a material balance sheet as new Appendix A to Volume <br />XI. The volumes proposed for cover fill and topsoil replacement may require revision <br />depending on the outcome of Item 15, above. <br />BOW2: Appendix A is no longer included with this revision. <br />22. DRMS: Drainage from the East and West Topsoil stockpiles, as currently approved, <br />