Laserfiche WebLink
Susan Burgmaier -12- February 7, 2014 <br />Please provide a revised plan view so that the contours of the basin are <br />visible. <br />BOW2; Please see revised Map 22 -3. <br />f) The plan view provided for Pond J indicates that the scale is 1" = 50'. The bar scale <br />within the view shows 1" = 30'. Please verify and correct the scales for the <br />Pond J plan view. <br />BOW2. The correct scale is 1 " =50 ". Please see revised Map 22 -3. <br />g) The Ditch H1 detail indicates that there will be 10" rip rap lining the channel. The <br />design information on page App. B -8 shows 3" rip rap. Please revise the Ditch <br />H1 detail to be consistent with the design information on page App, B -8. <br />BOW2; Please see revised Map 22 -3. <br />h) Minimum Ditch Depth Requirements Table, lower middle of map - the ditch depth <br />and flow depth shown for Ditches J2, 14, J7, 117, J18, and J19 are inconsistent with <br />the designs on page App. B -18, B -47, B -49, B -23, B -24, and B -26, respectively. <br />Please revise the Ditch Depth Requirements Table on Map 22J to be <br />consistent with the designs in Appendix 8 of Volume XI. <br />BOW2; This adequacy item revealed an inconsistency in the design event used for <br />certain ditches. Ditches 14, 5 & 7 have been re- designed for the 10 -year event. <br />Therefore, Map -22 and App B -2 have been revised. Due to the numerous <br />changes in page numbering, Appendix B beyond pages App. B -15 will be re- <br />submitted to incorporate the changes. Please see revised pages App. B -15 to the <br />end. It appears ditches J17, 18 & 19 are consistent with the table shown on Map <br />22 -J as well as the summary on page App B -1. <br />i) The list of ditches under the Trapezoidal Ditch heading needs to be <br />revised to include Ditches J10 and J11, and remove the -2 and -3 <br />extensions from ditches J8 and J9. <br />BOW2: Please see revised Map 22 -3 <br />41. DRMS: Map 32 - Topsoil Distribution Plan - Please explain why the <br />replacement depth for the F1 topsoil stockpile distribution area is being <br />changed, and demonstrate that this change is consistent with the <br />requirements of Rule 4.06.4(2)(a). <br />BOW2: Please remove Map 32 from TR -84 and include it in the TR -77 <br />application package, <br />