Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />PSES Pipe Rack Liner Extension <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />February 4, 2014 <br />ameO <br />was placed in accordance with the method specification that can be found in <br />Appendix E.1. Material above the 24 inches of DCF was placed in maximum 12 -inch- <br />loose lifts and compacted using a minimum 10 -ton (static drum weight) vibratory <br />smooth -drum compactor performing a minimum of four passes over the material as <br />described in Appendix E.2. <br />6 <br />