Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />PSES Pipe Rack Liner Extension <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />February 4, 2014 <br />ameO <br />are presented in the Drawings section of this report, and Technical Specifications are <br />presented in Appendix E. <br />1.5 Record Survey Documentation <br />Ames provided the Record Drawings for the activities associated with the PSES Pipe <br />Rack Liner Extension. A Colorado Registered Professional Land Surveyor prepared <br />and stamped the drawings. The Record Drawings are presented in Appendix A and <br />the Surveyor's certificate is presented in Appendix F. Ames provided locations for <br />geomembrane panels and destructive tests, which were used by AMEC to develop the <br />geomembrane panel layout drawing (Sheet 2 of 2 in Appendix A). <br />1.6 Certification Boundary <br />Figure 2 presents the boundary of the PSES Pipe Rack Liner Extension that is being <br />certified in this report. The certification boundary coincides with the limits of the PSES <br />Pipe Rack Liner Extension footprint and includes site grading, GCL installation, 80 -mil <br />double -sided textured LLDPE geomembrane installation, and DCF placement. <br />4 <br />