My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> SECTION 03320.0 CEMENTED ROCKFILL <br /> PART 1: GENERAL <br /> 1.01 RELATED SECTIONS <br /> Refer to the following Sections for related work: <br /> ■ Section 02200.0—Earthworks <br /> ■ Section 02210.0—Underground Working Remediation <br /> ■ Section 03300.0—Concrete Plug <br /> 1.02 SUBMITTALS <br /> A. CONTRACTOR shall provide product data to allow evaluation by MANAGER and <br /> CERTIFYING ENGINEER. <br /> B. CONTRACTOR's mix design for each tentative mix for cemented rockfill shall contain the <br /> following information: <br /> 1. Total gallons of water per cubic yard. <br /> 2. Brand,type,composition,and quantity of cement. <br /> 3. Time of initial set. <br /> 4. Placement and compaction technique, including chute arrangement to transfer material <br /> from truck to bottom of underground working without contaminating the Cemented <br /> Rockfill with loose surficial soils. <br /> 5. Method of mixing the aggregate and cement,and transporting the Cemented Rockfill. <br /> 1.03 TOLERANCES <br /> Cemented rockfill shall be placed to the lines and dimensions shown on the DRAWINGS. <br /> 1.04 QUALITY ASSURANCE <br /> A. Any Work found unsatisfactory or any Work disturbed by subsequent operations before acceptance <br /> is granted shall be corrected by CONTRACTOR,at no additional cost to CC&V. <br /> PART 2: PRODUCTS <br /> 2.01 MATERIALS <br /> A. Portland Cement,ASTM C 150,Type V. <br /> B. Fine Shaft Backfill <br /> Section 03310 Page 1 of 2 May 9,2012 <br /> Cemented Rockfill Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.