My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> 2.02 MIXES <br /> A. Cemented Rockfill: <br /> 1. Maximum Aggregate size of 2-inch. <br /> 2. 6 percent(by dry weight)cement. <br /> 3. The Cemented Rockfill will be placed at a water content to be approved by CERTIFYING <br /> ENGINEER,corresponding to approximately at optimum water content to wet of optimum <br /> water content,as determined by ASTM D698. <br /> PART 3: EXECUTION <br /> 3.01 INSTALLATION <br /> A. CONTRACTOR shall prepare the underground working to minimize the amount of sloughing in of <br /> material from the sides. <br /> B. No water shall be added after leaving the mixing area/batch plant without the approval of <br /> MANAGER and CERTIFYING ENGINEER. <br /> C. The surface of hardened concrete on which fresh Cemented Rockfill is to be placed shall be rough, <br /> and cleaned of all laitance and foreign substances. <br /> D. The rock surface within the competent bedrock of the underground working shall be scaled to <br /> removed any loose material prior to Cemented Rockfill placement. <br /> E. Each 3 foot thick lift of the Cemented Rockfill shall be compacted according to a method <br /> specification,approved by the MANAGER and CERTIFYING ENGINEER. <br /> 3.02 FIELD QUALITY CONTROL <br /> A. All concrete testing(both field and laboratory testing)will be the responsibility of CONTRACTOR. <br /> CONTRACTOR shall be responsible for cooperating with CQA Monitor during all testing <br /> activities. CONTRACTOR shall provide equipment and labor to assist CQA Monitor in sampling, <br /> if requested,and shall also provide access to all areas requiring testing activities. <br /> B. Any Work found unsatisfactory or any Work disturbed by subsequent operations before acceptance <br /> is granted shall be corrected by CONTRACTOR. <br /> ***END OF SECTION*** <br /> Section 03310 Page 2 of 2 May 9,2012 <br /> Cemented Rockfill Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.