Laserfiche WebLink
ameO <br /> C. Standard compression tests shall be performed to determine the compressive strength: one at seven <br /> (7) days, and two at twenty-eight (28) days. The fourth cylinder shall be kept in reserve for <br /> additional testing, if necessary. <br /> D. Slump testing shall be performed at the time the cylinders are prepared. <br /> ***END OF SECTION*** <br /> Section 03300 Page 5 of 5 May 9,2012 <br /> Cast-In-Place Concrete Revision 1 <br />