ameO <br /> PART 6: EARTHWORKS CONSTRUCTION OUALITY ASSURANCE <br /> Construction of the mill site or specified earthworks shall be in accordance with the DRAWINGS and <br /> SPECIFICATIONS. A CQA monitoring and testing program shall be implemented by CC&V to ensure <br /> construction compliance by the CONTRACTOR. The CQA testing program shall consist of construction <br /> testing of materials used in the mill site construction. The types of materials are defined in the <br /> SPECIFICATIONS. During construction, the CQA Monitor shall sample and test these soil types to <br /> determine if they meet SPECIFICATIONS. The CQA Monitor shall obtain and test soil samples in <br /> accordance with American Society for Testing and Material standards ASTM D75 and ASTM D420. All tests <br /> shall be performed by the CQA Monitor on-site or in a geotechnical laboratory approved by the <br /> CERTIFYING ENGINEER. <br /> 6.01 CONSTRUCTION TESTING: <br /> During construction,the CQA Monitor shall test all earthwork components to verify that the construction is in <br /> accordance with the SPECIFICATIONS. Testing shall be performed on all soil used in the construction to <br /> confirm the materials meet SPECIFICATIONS. The CQA Monitor shall conduct testing after final placement <br /> of the materials. The tests to be performed, and the testing frequency, for each material type are listed in <br /> Tables 1 and 2. The testing frequencies specified in Tables 1 and 2 shall be increased when the CQA Monitor <br /> determines that construction conditions(such as adverse weather,equipment breakdown, improperly ballasted <br /> compactor, excessive lift thickness, improper soil type, improper moisture conditioning and compaction) <br /> warrant additional tests. Additional tests will be approved by MANAGER and directed by the CQA Monitor. <br /> 6.02 CONSTRUCTION MONITORING: <br /> The CQA Monitor will monitor and test all earthwork quality assurance components of the construction to <br /> verify that the construction is in accordance with the SPECIFICATIONS. The CQA Monitor shall identify <br /> inadequate construction methodologies or materials that may adversely impact the performance of the facility <br /> being constructed and existing structures. The CQA Monitor will record visual observations throughout the <br /> construction process to ensure that the materials are placed to the minimum dimensions as shown on the <br /> DRAWINGS. Quality control testing will be performed by the CONTRACTOR. <br /> 6.02.01 FOUNDATION PREPARATION: <br /> The CQA Monitor shall observe and document the foundation preparation including: <br /> ■ stripping and excavation activities to ensure that CONTRACTOR places the material in the <br /> appropriate stockpile (Structural/Overburden Fill, Select Structural Fill, Underdrain Fill, <br /> Bedding Fill, Soil Liner Fill, Drain Cover Fill, Coarse Shaft Backfill, Fine Shaft Backfill, <br /> Pipe Bedding Material and Granular Filter Material),if stockpiling is necessary; <br /> ■ stockpiling activities to verify location of stockpile,material type,and dressing; <br /> ■ excavations for moisture seeps,unsuitable foundation soil,elevation,and proper drainage; <br /> ■ subgrade preparation to confirm that the surface of the subgrade is free of soft, organic, and <br /> otherwise deleterious materials (such as debris, branches, vegetation, mud, ice, or frozen <br /> materials); and that soil and rock surfaces that contain joints or fractures are adequately filled <br /> in accordance with the SPECIFICATIONS;and <br /> Section 01400.1 Page 5 of 10 May 9,2012 <br /> Earthworks CQA Plan Revision 1 <br />