2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> PART 5: MEETINGS <br /> This section identifies and describes the meetings to be held during the course of the construction. Meetings <br /> shall be held in order to clearly define construction activities and goals in order to facilitate construction. <br /> 5.01 PRECONSTRUCTION MEETING: <br /> MANAGER will hold a preconstruction meeting at the site prior to the start of construction. MANAGER, <br /> DESIGN ENGINEER, CERTIFYING ENGINEER, CQA Monitor, CONTRACTOR, and others <br /> designated by MANAGER shall attend this meeting. The purpose of this meeting will be to: <br /> ■ review the construction DRAWINGS,CQA Plan,and SPECIFICATIONS; <br /> ■ define the responsibilities of each party; <br /> ■ define lines of communication and authority; <br /> ■ review method of documentation,testing procedures,and reporting inspection data; <br /> ■ establish testing protocols and procedures for correcting and documenting construction <br /> deficiencies; <br /> ■ discuss any changes that may be needed to ensure that construction will be completed in <br /> compliance with the design;and <br /> ■ This meeting will be documented by MANAGER and copies will be distributed to all parties. <br /> 5.02 PROGRESS MEETINGS: <br /> MANAGER will hold a daily progress meeting, either before the start of work or at the completion of work. <br /> At a minimum,this meeting will be attended by the CQA Monitor and CONTRACTOR. The purpose of this <br /> meeting will be to: <br /> ■ review all the previous day's accomplishments and activities; <br /> ■ review scheduled work location and activities for the day; <br /> ■ discuss any problems or potential construction problems;and, <br /> ■ review test data. <br /> 5.03 DEFICIENCY MEETINGS: <br /> Special meetings will be held, as needed,to discuss potential problems or deficiencies. At a minimum,these <br /> meetings will be attended by the CQA Monitor and CONTRACTOR. If the problem relates to a design <br /> issue, MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER should also be present. The <br /> meeting will be documented by the CQA Monitor. <br /> Section 01400 1 Page 4 of 10 May 9,2012 <br /> Earthworks CQA Plan Revision 1 <br />