Laserfiche WebLink
ameO <br /> ■ report any deficiencies to MANAGER that are not corrected to the satisfaction of the CQA <br /> Monitor,including design or SPECIFICATION changes; <br /> ■ prepare a Construction Certification Report describing the construction, any deviations from <br /> SPECIFICATIONS or DRAWINGS and details, details of all field and laboratory test data, <br /> tests results (both laboratory and field), professional certification that construction was <br /> completed in accordance with the DRAWINGS and SPECIFICATIONS. The Construction <br /> Certification Report will be signed and sealed by the CERTIFYING ENGINEER registered <br /> in the State of Colorado; <br /> ■ monitor the ambient air temperature and fill temperature, as outlined in specification Section <br /> 2200;and <br /> ■ maintain an on-site soils laboratory and perform regular calibration of equipment. <br /> 2.06 EARTHWORKS CONTRACTOR <br /> The Earthworks Contractor, also referred to as "CONTRACTOR", is responsible for proper processing, <br /> delivery and placement of all components as outlined in the SPECIFICATIONS. <br /> PART 3: LINES OF COMMUNICATION <br /> The CQA Monitor shall be capable of direct communication with MANAGER, DESIGN ENGINEER and <br /> CERTIFYING ENGINEER at all times. Deficiencies that can be easily remedied, such as unsatisfactory <br /> test results,will be dealt with directly between the CQA Monitor,and CONTRACTOR. The CQA Monitor <br /> will also discuss any deficiencies with the CERTIFYING ENGINEER. <br /> If there is a disagreement among the DESIGN ENGINEER, CERTIFYING ENGINEER, and/or <br /> MANAGER that can not be resolved among themselves, MANAGER shall present the matter to CC&V <br /> with MANAGER related recommendations and CC&V shall decide the matter with such decision being <br /> final. <br /> PART 4: DEFICIENCIES <br /> When deficiencies (items that do not meet SPECIFICATIONS or DRAWINGS) are discovered, the CQA <br /> Monitor will immediately determine the nature and extent of the problem and notify the CONTRACTOR. If <br /> unsatisfactory test results identify a deficiency, additional tests will be performed to define the extent of the <br /> deficient area. <br /> CONTRACTOR shall correct the deficiency to the satisfaction of the CQA Monitor. If CONTRACTOR is <br /> unable to correct the problem, the CQA Monitor will notify MANAGER and CERTIFYING ENGINEER <br /> which will assist in problem resolution. If the solution involves a design revision,the DESIGN ENGINEER <br /> shall also be contacted. <br /> The CQA Monitor shall retest and the MANAGER and CERTIFYING ENGINEER shall approve the <br /> corrected deficiencies before any additional related work is performed by CONTRACTOR. All retests and <br /> related documentation shall be recorded by the CQA Monitor and included in the Construction Certification <br /> Report. <br /> Section 01400 1 Page 3 of 10 May 9,2012 <br /> Earthworks CQA Plan Revision 1 <br />