My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> ■ construction of access roads, drainage control features and erosion control features to verify <br /> compliance with the DRAWINGS and SPECIFICATIONS. <br /> 6.02.02 PLACEMENT OF MATERIALS: <br /> During placement of Structural/Overburden Fill, Select Structural Fill, Coarse Shaft Backfill, Cemented <br /> Rockfill, Underdrain Fill, Bedding Fill, Soil Liner Fill, Drain Cover Fill, Fine Shaft Backfill, Pipe Bedding <br /> Material and Granular Filter Material,the CQA Monitor shall: <br /> ■ verify the use of appropriate fills; <br /> ■ monitor and document material placement, including soil type, particle size, loose lift <br /> thickness, moisture conditioning process, compaction equipment and methods used to attain <br /> compaction, including number of passes, uniformity of compaction coverage, compacted lift <br /> thickness, bonding of lifts and in-place moisture content and dry density is in compliance <br /> with the SPECIFICATIONS; <br /> ■ monitor Soil Liner Fill surface preparation to verify that the surface has been proof-rolled, <br /> compacted, or hand worked so as to be in a condition suitable for geomembrane installation <br /> as discussed in Section 02200 of the SPECIFICATIONS; <br /> ■ monitor Bedding Fill placement and surface preparation to verify that the surface is suitable <br /> for geomembrane installation as discussed in Section 02200 of the SPECIFICATIONS; <br /> ■ monitor the placement of fill to ensure that CONTRACTOR exercises care in the vicinity of <br /> pipes and that the underlying geosynthetics are not damaged; <br /> ■ monitor and document CONTRACTOR verification of in-place Soil Liner Fill,Bedding Fill, <br /> and Drain Cover Fill thickness; <br /> ■ monitor equipment being used to place Drain Cover Fill to verify that the CONTRACTOR <br /> places the material in accordance with the SPECIFICATIONS; <br /> ■ monitor that Drain Cover Fill is pushed uphill for areas in which the slope exceeds 4H:1 V <br /> and that the dozer does not perform unacceptable pivot turns;and <br /> ■ monitor the fill temperature as identified in Section 02200 of the SPECIFICATIONS. <br /> PART 7: DOCUMENTATION <br /> Documentation kept by the CQA Monitor shall consist of daily record-keeping, construction problem <br /> resolutions, design and SPECIFICATION changes, photographic records of construction, weekly progress <br /> reports,chain of custody forms for test sample tracking,and a Construction Certification Report. <br /> 7.01 DAILY RECORD KEEPING: <br /> Daily records kept by the CQA Monitor shall consist of field notes, observation and testing data sheets, <br /> summary of the daily meeting with CONTRACTOR,and reporting of construction problems and resolutions. <br /> The CQA Monitor shall submit this information on a regular basis to MANAGER for review. <br /> Section 01400.1 Page 6 of 10 May 9,2012 <br /> Earthworks CQA Plan Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.