ameO <br /> 2. Installation shall be performed under the constant direction of single Installation <br /> Superintendent who shall remain on-site and be responsible,throughout the geomembrane <br /> installation, for geomembrane layout, seaming, patching, testing, repairs, and all other <br /> activities by INSTALLER. <br /> 3. The Installation Superintendent shall have installed or supervised, at a minimum three <br /> installation projects that entailed the installation of at least a total of 1,000,000 square feet of <br /> the type of geomembrane that is being installed at the mill site earthworks project. <br /> 4. Actual seaming shall be performed under the direction of a Master Seamer(who may also <br /> be the Installation Superintendent)who has seamed a minimum of 1,000,000 square feet of <br /> the type of geomembrane that is being installed at the mill site earthworks project,using the <br /> same type of seaming apparatus specified for the Work. <br /> 5. The Installation Superintendent and/or Master Seamer shall be present whenever seaming is <br /> perfonned. <br /> C. Quality Assurance Program <br /> 1. All WORK shall be constructed,monitored,and tested in compliance with the requirements <br /> of the Construction Quality Assurance Plan (Section 01400.2). CONTRACTOR and <br /> MANUFACTURER shall participate in and comply with all items in these <br /> SPECIFICATIONS and requirements of the CQA plan. <br /> 2. CONTRACTOR shall ensure that each geomembrane MANUFACTURER that supplies <br /> materials to this project has an internal product quality control program that meets <br /> SPECIFICATIONS. <br /> 3. During manufacturing of the geomembrane, samples of geomembrane shall be removed for <br /> laboratory testing to ensure compliance with this SPECIFICATION. Conformance <br /> sampling and testing will be performed in accordance with the Construction Quality <br /> Assurance Plan. <br /> 4. CONTRACTOR shall assure that the geomembrane is delivered to the site at least 10 <br /> calendar days prior to installation. CONTRACTOR will provide required Quality Control <br /> information 10 calendar days prior to geosynthetics being delivered to the mill site <br /> earthworks project and on delivery of geosynthetics to the mill site earthworks project. <br /> 5. Geomembrane rolls that do not meet the requirements of this SPECIFICATION will be <br /> rejected. CONTRACTOR shall replace the rejected material with new material that <br /> conforms to the SPECIFICATION requirements,at no additional cost to CC&V. <br /> 6. CONTRACTOR shall ensure that all personnel performing geomembrane-seaming <br /> operations are qualified by experience or by successfully passing seaming tests(see Article <br /> 3.08(D) of this section). MANAGER reserves the right to reject any welding technician <br /> whose performance is unsatisfactory. <br /> 7. INSTALLER'S Superintendent and QC Inspector shall attend the pre-construction <br /> meeting. <br /> Section 02776 Page 4 of 22 May 9,2012 <br /> Geomembrane Revision 1 <br />