My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> 11. Certification that extrudate to be used is composed of the same resin type as the <br /> geomembrane to be used. <br /> C. Submittals By CONTRACTOR to MANAGER during the course of the work. <br /> 1. Daily reports detailing arrival and departure times, the personnel present on-site, the <br /> progress of the Work, the arrival of materials, daily square footage deployed and seamed, <br /> daily square footage of geomembrane approved by the CQA Monitor and any problems <br /> encountered. <br /> 2. Subgrade surface acceptance certificates for each area to be covered by the lining system, <br /> signed by CONTRACTOR. <br /> D. Without limiting the provisions of the Contract, the CONTRACTOR shall warrant the Work to <br /> MANAGER in accordance with the following: <br /> 1. The geomembrane supplied is suitable for the environmental conditions at the site and the <br /> service conditions as described in this SPECIFICATION. <br /> 2. The geomembrane supplied meets or exceeds all published SPECIFICATIONS as <br /> referenced by the SPECIFICATION. <br /> 3. The geomembrane are free of defects in materials and workmanship. <br /> 4. The CONTRACTOR shall repair or replace all defects in the material detected on-site, <br /> including uncovering and recovering the work, in compliance with the <br /> SPECIFICATIONS at no additional cost to CC&V. <br /> 5. The CONTRACTOR shall repair any detected leaks in any seams (Manufactured or field <br /> joined), including uncovering and recovering the work, in compliance with the <br /> SPECIFICATIONS at no additional cost to CC&V. <br /> 1.03 QUALITY ASSURANCE <br /> A. Manufacturing Qualifications <br /> 1. The MANUFACTURER(s) shall have experience in the manufacture of the type of <br /> geomembrane that is being installed at the mill site earthworks project totaling at least five <br /> completed facilities totaling a minimum of 5,000,000 square feet between all five facilities. <br /> 2. The MANUFACTURER shall provide sufficient production and qualified personnel to <br /> meet the demands of the work and shall have an internal quality control program for its <br /> product. <br /> 3. The MANUFACTURER shall permit MANAGER, DESIGN ENGINEER, and/or <br /> CERTIFYING ENGINEER or their authorized representative to visit the manufacturing <br /> plant. <br /> B. Geomembrane Installation Qualifications(INSTALLER) <br /> 1. INSTALLER shall be the MANUFACTURER or an approved CONTRACTOR trained <br /> and licensed to install the MANUFACTURER's geomembrane. <br /> Section 02776 Page 3 of 22 May 9,2012 <br /> Geomembrane Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.