Laserfiche WebLink
ameO <br /> C. Thickness of geomembrane and surface area of the installed geomembrane. <br /> d. Type of seaming,patching,and tacking equipment. <br /> e. A copy of the MANUFACTURER's and/or Fabricator's approval letter(s)and/or <br /> license(s),if applicable. <br /> B. CONTRACTOR shall provide the following information after contract award but within ten (10) <br /> days prior to geomembrane arrival on-site and prior to commencement of the Work: <br /> I. A copy of each of the Quality Control Certificates on each lot of resin issued by the resin <br /> Supplier for the specific material for this project including certification of the resin for <br /> extrusion welding. <br /> 2. The results of Quality Control testing conducted by the MANUFACTURER on the resin <br /> used in manufacturing the specific material for this project. <br /> 3. A listing that correlates the resin to the individual geomembrane rolls and welding rods. <br /> 4. A copy of the geomembrane roll Quality Control Certificates. These certificates shall be <br /> supplied at a minimum frequency of one(1)per every fifty thousand(50,000)square feet of <br /> geomembrane material produced. These certificates shall be issued only for the individual <br /> geomembrane rolls sampled and tested by the MANUFACTURER or its representative. <br /> The certificates will contain test results of properties outlined in Article 2.01 of this Section. <br /> MANAGER reserves the right to refuse use of any geomembrane supplied without the <br /> proper quality control documentation at no cost to CC&V. <br /> 5. A detailed list of performance criteria for the geomembrane material being produced for this <br /> project. (Note: Performance criteria are sometimes referred to as "minimum property <br /> values." Refer to Articles 2.01 and 2.02 of this Section for geomembrane properties and <br /> Test Methods.) <br /> 6. Resume from the INSTALLER of the Installation Superintendent, Master Seamer, and <br /> Quality Control Inspector to be assigned to the work, including dates and duration of <br /> employment. <br /> 7. Certification from the INSTALLER that both the Installation Supervisor, Quality Control <br /> Inspector,and Master Seamer have reviewed the SPECIFICATIONS,Construction Quality <br /> Assurance Plan,and the DRAWINGS. <br /> 8. A panel layout drawing showing the proposed installation layout identifying field seams <br /> and including areas such as sumps,trenches and pipe penetrations as well as any variance or <br /> additional details that deviate from the DRAWINGS. The layout shall be adequate for use <br /> as a construction plan and shall include dimensions, details, etc. Any proposed variance or <br /> deviation from these documents shall be submitted to MANAGER in writing a minimum <br /> of seven(7)Working days prior to the scheduled start of geomembrane installation and will <br /> be accepted/rejected by CERTIFYING ENGINEER prior to start of installation. <br /> 9. A list of personnel performing field-seaming operations along with pertinent experience <br /> information. <br /> 10. All geosynthetic Quality Control Certificates required by these SPECIFICATIONS. <br /> Section 02776 Page 2 of 22 May 9,2012 <br /> Geomembrane Revision 1 <br />