My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> pipe has not been crushed. Costs associated with proving pipes have not been crushed shall be borne <br /> by CONTRACTOR. <br /> C. Piping shall be placed to the lines and elevations shown on the DRAWINGS,with no sags or humps, <br /> as approved by MANAGER and CERTIFYING ENGINEER. <br /> 3.02 PIPE CONNECTIONS <br /> A. All connections for non-perforated pipe shall be watertight under maximum anticipated pressure <br /> head. <br /> B. The ends of all pipe shall be capped with a manufactured pipe cap. <br /> C. HDPE pipe will be butt-heat-fusion welded in accordance with the MANUFACTURER's guidelines. <br /> D. CPe pipe joints shall conform to MANUFACTURER's recommendations. <br /> 3.03 BEDDING AND BACKFILL <br /> A. CONTRACTOR shall bed and backfill Pump Riser piping with Drain Cover Fill. <br /> B. Placement of Pump Riser pipes shall be coordinated with other operations such as Structural Fill, <br /> Select Structural Fill,and Drain Cover fill placement. Equipment access directly on geosynthetics is <br /> expressly prohibited. Any damage to the geosynthetics caused by CONTRACTOR during pipe <br /> placement shall be repaired at the expense of CONTRACTOR. <br /> C. A minimum of 4 feet of Drain Cover Fill shall be placed over the top of the pipe before crossing with <br /> rubber-tired construction equipment. If pipe becomes crushed during or after installation by <br /> CONTRACTOR's equipment or methods of construction, the pipe shall be replaced by <br /> CONTRACTOR, at no additional cost to CC&V. The CONTRACTOR will be required to <br /> demonstrate to MANAGER that the equipment and procedures used are not detrimental to the <br /> piping,at no additional cost to CC&V. <br /> D. CONTRACTOR shall hold pipes in place with sand bags, or other methods approved by <br /> MANAGER, until the Drain Cover Fill has been placed. Directly before placement of the Drain <br /> Cover Fill,the sand bags will be removed. <br /> ***END OF SECTION*** <br /> Section 02710 Page 2 of 2 May 9,2012 <br /> Piping Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.