ameO <br /> SECTION 02710.0 PIPING <br /> PART 1: GENERAL <br /> 1.01 RELATED SECTIONS <br /> Refer to the following Sections for related work: <br /> ■ Section 02200.0-Earthworks <br /> ■ Section 02776.0-Geomembrane <br /> ■ Section 02777.0-Geotextile <br /> 1.02 SUBMITTALS <br /> A. CONTRACTOR shall abide by all qualification and submittal requirements. <br /> B. CONTRACTOR shall provide product data including MANUFACTURER's technical data(resin), <br /> test data (strength), and SPECIFICATIONS sufficient to allow evaluation by MANAGER and <br /> CERTIFYING ENGINEER. <br /> 1.03 QUALITY ASSURANCE <br /> A. All work shall be constructed,monitored,and tested in accordance with the requirements of the CQA <br /> Plan. <br /> B. Any work found unsatisfactory or any work disturbed by subsequent operations before acceptance is <br /> granted shall be corrected by CONTRACTOR as directed by MANAGER at no additional cost to <br /> CC&V. <br /> PART 2: PRODUCTS <br /> 2.01 MATERIALS <br /> A. Pump Riser Pipe: <br /> 1. 4-inch "Highway Grade" perforated corrugated polyethylene (CPe) pipe, as manufactured <br /> by Advanced Drainage Systems, Inc., or an equivalent approved by MANAGER, <br /> DESIGN ENGINEER and CERTIFYING ENGINEER. <br /> 2. 48-inch diameter solid SDR 17 HDPE pipe, as manufactured by DRISCOPIPE or an <br /> equivalent approved by MANAGER, DESIGN ENGINEER and CERTIFYING <br /> ENGINEER. <br /> PART 3: EXECUTION <br /> 3.01 INSTALLATION <br /> A. CONTRACTOR shall install pipe according to MANUFACTURER's recommendations. <br /> B. CONTRACTOR shall take all precautions necessary to not damage the pipe during material <br /> placement. CONTRACTOR may periodically be requested by MANAGER to verify that covered <br /> Section 02710 Page 1 of 2 May 9,2012 <br /> Piping Revision 1 <br />