My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> 3.03 NATIVE MATERIAL <br /> For the remediation of shafts greater than 25 feet, which are currently backfilled with native material, <br /> CONTRACTOR shall excavate the current native backfill to a depth of 25 feet below existing grade <br /> elevation. The surface of the native material at this elevation will then be compacted using a method <br /> specification that results in a firm surface that will be approved by CERTIFYING ENGINEER. <br /> CONTRACTOR shall then remediate the underground working using Coarse Shaft Backfill, Cement Plug, <br /> Cemented Rockfill,and/or Geogrid cap as shown on the DRAWINGS. <br /> 3.04 BLASTING <br /> The CONTRACTOR shall compact the surface of the area that has been blasted. If the blasted surface is <br /> below the Soil Liner subgrade elevation, the CONTRACTOR shall compact the blasted surface using a <br /> method specification approved by the CERTIFYING ENGINEER, and then remediate according to the <br /> DRAWINGS to achieve the design grades and elevations. If the blasted surface is above the Soil Liner <br /> subgrade elevation, the CERTIFYING ENGINEER assess the foundation conditions and recommend <br /> whether the CONTRACTOR shall overexcavate and backfill with Cemented Rockfill and <br /> Structural/Overburden Fill, or if the CONTRACTOR shall remove excess material and compact the final <br /> grade surface using a method specification approved by the CERTIFYING ENGINEER. <br /> *** END OF SECTION*** <br /> Section 02210 Page 3 of 3 May 9,2012 <br /> Underground Working Remediation Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.