My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> requirements of Sections 02776.0 and 02777.0 of these SPECIFICATIONS,and recover,at <br /> no cost to CC&V. <br /> 7. CONTRACTOR shall place Drain Cover Fill at a rate such that the geomembrane liner is <br /> not exposed to ultraviolet light for more than 180 days. <br /> 8. CONTRACTOR shall provide close continuous monitoring at the point of placement <br /> during the placement of the Drain Cover Fill over geosynthetics. <br /> 9. CONTRACTOR shall verify the final thickness of Drain Cover Fill to determine <br /> compliance with this SPECIFICATION. CONTRACTOR shall record verification <br /> location, elevation, and thickness. CQA Monitor shall witness all verification <br /> measurements. CONTRACTOR will submit a method of verifying Drain Cover Fill depth <br /> to MANAGER for approval. Grade markers shall be placed on a 50-by-50-foot grid with <br /> additional points required for breaks in grade. CONTRACTOR shall remove all grade <br /> markers under supervision of CQA Monitor after verification measurements have been <br /> approved by MANAGER and CERTIFYING ENGINEER and will backfill holes with <br /> Drain Cover Fill. Areas with deficient thickness shall be reworked by CONTRACTOR, <br /> until acceptable measurements are obtained. If MANAGER or CERTIFYING <br /> ENGINEER suspects the occurrence of any damage to the underlying geosynthetics, <br /> MANAGER will instruct CONTRACTOR to remove Drain Cover Fill to expose the <br /> geosynthetics. CONTRACTOR shall uncover, repair any observed damage of the <br /> underlying geosynthetics, in accordance with the repair requirements of Sections 02776.0 <br /> and 02777.0 of these SPECIFICATIONS and recover,at no cost to CC&V. <br /> 10. CONTRACTOR will provide adequate illumination as approved by MANAGER,if Drain <br /> Cover Fill placement is carried out at night. A minimum of 2-foot candles measured at the <br /> synthetic liner shall be used when Drain Cover Fill placement is carried out at night. <br /> G. Pipe Bedding Material <br /> 1. CONTRACTOR shall compact the Pipe Bedding Material requiring compaction to at least <br /> 95 percent of the maximum dry density as determined by the Standard Proctor density test <br /> (ASTM D698), and a moisture content 3 percent below and 3 percent over the optimum <br /> moisture content. <br /> 2. CONTRACTOR shall place Pipe Bedding Material in maximum 12-inch loose lifts. Pipe <br /> Bedding Material will be worked under pipe haunches by hand to provide uniform support <br /> of the piping. <br /> 3. Native material used for backfilling the remaining portion of the excavation shall be placed <br /> in 12-inch to 18-inch loose lifts,and compacted by wheel rolling with light,rubber tired or <br /> other light compaction equipment,as approved by CERTIFYING ENGINEER. <br /> H. Granular Filter Material <br /> 1. Granular Filter Material shall be placed beneath the Riprap as shown on the drawings. <br /> I. Bedding Fill <br /> 1. Bedding Fill shall be placed within the limits of the mill site earthworks project as shown on <br /> the DRAWINGS. <br /> Section 02200 Page 14 of 16 May 9,2012 <br /> Earthworks Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.