ameO <br /> 17. If tests indicate the Work does not meet the requirements of the SPECIFICATIONS, <br /> MANAGER and CERTIFYING ENGINEER will establish the extent of the <br /> nonconforming area. The nonconforming area shall be reworked by CONTRACTOR <br /> until acceptable test results are obtained at no additional cost to CC&V <br /> 18. Prior to any geosynthetics being placed on Soil Liner Fill, the area will be tested by CQA <br /> Monitor. No geosynthetics will be allowed to be placed on frozen material, as defined in <br /> Section 3.06,unless approved by the CERTIFYING ENGINEER. <br /> F. Drain Cover Fill <br /> 1. Drain Cover Fill shall be placed over the geomembrane in the locations shown on the <br /> DRAWINGS. <br /> 2. Prior to placing the Drain Cover Fill, CONTRACTOR shall verify by visual inspection <br /> that the underlying geosynthetics are free of holes, tears, wrinkles, or foreign objects. <br /> MANAGER and CERTIFYING ENGINEER will inspect the geosynthetic for wrinkles <br /> prior to placement of Drain Cover Fill. As instructed by MANAGER, CONTRACTOR <br /> shall "work out" wrinkles to the satisfaction of MANAGER and CERTIFYING <br /> ENGINEER prior to placement of the Drain Cover Fill. In all cases,wrinkles shall not be <br /> of a size that they could fold back on themselves. Wrinkles greater than one foot shall be <br /> removed and repaired by the INSTALLER. <br /> 3. CONTRACTOR shall place Drain Cover Fill in a single 24-inch loose lift. The tracked <br /> equipment shall operate only over previously placed Drain Cover Fill. CONTRACTOR <br /> shall not operate equipment directly on geosynthetics. Only a dozer with a ground pressure <br /> not exceeding 8.7 psi can be used to place Drain Cover Fill. A CAT 12G motor grader,or <br /> equivalent approved by CERTIFYING ENGINEER, can be used for Drain Cover Fill <br /> final grading. Equipment used for placement will not be allowed to pivot on one track(i.e., <br /> no abrupt or sharp turns). There shall be no downhill placement on slopes steeper than <br /> 4H:IV. Material can be placed along contours if buttressed from below. Motor graders <br /> shall not be allowed to make abrupt turns,brake suddenly, or dig blade in which results in <br /> the tires spinning on the Drain Cover Fill surface. <br /> 4. Highway compatible Rubber tired construction equipment shall not be allowed to travel <br /> over the geomembrane or on top of geomembrane unless a thickness of at least 45 inches of <br /> Drain Cover Fill has been placed over the geomembrane. The CONTRACTOR will be <br /> required to demonstrate to the MANAGER, DESIGN ENGINEER and CERTIFYING <br /> ENGINEER that the equipment and procedures used are not detrimental to the <br /> geomembrane,at no cost to CC&V. Off road haul truck traffic shall require a minimum of <br /> 60 inches for Cat 773 (or equivalent)of Drain Cover Fill placed over the geomembrane and <br /> a minimum of 120 inches for CAT 777 (or equivalent) of Drain Cover Fill placed over the <br /> geomembrane. <br /> 5. When placing Drain Cover Fill the maximum acceptable drop height is 3 feet. <br /> 6. CONTRACTOR shall operate equipment in a manner that is protective of underlying <br /> geosynthetics. if MANAGER or CERTIFYING ENGINEER suspects the occurrence of <br /> any damage to the underlying geosynthetics, MANAGER will instruct CONTRACTOR <br /> to remove Drain Cover Fill to expose the geosynthetics. CONTRACTOR shall uncover, <br /> repair any observed damage of the underlying geosynthetics, in accordance with the repair <br /> Section 02200 Page 13 of 16 May 9,2012 <br /> Earthworks Revision 1 <br />