Laserfiche WebLink
ameO <br /> areas with slopes steeper than 3H:IV, CONTRACTOR shall adopt methods as necessary <br /> to obtain the same final surface preparations that would be obtained by the passage of a <br /> smooth-drum roller on flat or level ground. Pushing of compaction equipment by tracked <br /> equipment shall not be performed. Wheel ruts on the surface of the Soil Liner Fill from <br /> grading equipment shall be repaired by CONTRACTOR prior to placement of the <br /> geomembrane by rolling the surface as approved by CQA Monitor. <br /> 12. CONTRACTOR will remove angular protruding rocks greater than 3/4 inches in diameter <br /> from the compacted Soil Liner Fill surface. Indentations left in the Soil Liner Fill Surface <br /> after removal of the rocks shall be filled with Soil Liner Fill or other suitable fill approved <br /> by CQA Monitor, and compacted to achieve final grade. Areas of the Soil Liner Fill <br /> surface with concentrated gravelly areas will have suitable fill approved by CQA Monitor <br /> placed on top and compacted to achieve final grade. A maximum thickness of 0.5 inches of <br /> suitable fill will be placed on the Soil Liner Fill. <br /> 13. MANAGER and CERTIFYING ENGINEER will identify any areas of significant <br /> desiccation, crusting, or erosion of a lift surface. Soil Liner Fill surfaces found to have <br /> desiccation cracks greater than 0.25-inches in width or depth, or which exhibit swelling, <br /> heaving or other similar conditions shall be replaced or reworked by CONTRACTOR to <br /> remove such defects. Desiccation cracks on the Soil Liner Fill surface less than 0.25-inches <br /> in width or depth shall be compacted with a smooth drum roller. CONTRACTOR shall <br /> take whatever steps necessary to prepare Soil Liner Fill surface to the satisfaction of <br /> MANAGER and CERTIFYING ENGINEER,at no additional cost to CC&V. <br /> 14. CONTRACTOR shall maintain the Soil Liner Fill surface in a condition suitable for <br /> geomembrane installation as specified in these SPECIFICATIONS and in the CQA Plan <br /> until the surface is covered. CONTRACTOR shall repair all weather related damage to <br /> Soil Liner Fill surfaces or other portions of the Work that have or have not been covered by <br /> geomembrane,at no additional cost to CC&V. <br /> If any moisture is allowed to collect under the geomembrane prior to or after final seaming <br /> and softens the Soil Liner Fill, the geomembrane shall be removed and CONTRACTOR <br /> shall recondition and recompact the Soil Liner Fill to meet all placement and trimming <br /> SPECIFICATIONS,at no additional cost to CC&V. <br /> 15. CONTRACTOR shall remove all hubs and survey stakes in the Soil Liner Fill and backfill <br /> all holes with MANAGER and CERTIFYING ENGINEER approved moisture- <br /> conditioned Soil Liner Fill or bentonite. Compact with a Proctor hammer or other suitable <br /> device that will achieve a kneading type of compaction and will achieve the required <br /> density. <br /> 16. CONTRACTOR shall verify the final thickness of Soil Liner Fill to determine compliance <br /> with this SPECIFICATION. Thickness verification shall be performed at a minimum <br /> frequency of two measurements per acre using a soil-coring device, unless directed <br /> otherwise by MANAGER. CONTRACTOR shall record as part of the as-built <br /> documentation the location,elevation,and thickness of each Soil Liner Fill verification test. <br /> CQA Monitor will witness all verification measurements. CONTRACTOR shall backfill <br /> all holes with MANAGER and CERTIFYING ENGINEER approved moisture- <br /> conditioned Soil Liner Fill compacted with a Proctor hammer or other suitable device that <br /> will achieve a kneading type of compaction and will achieve the required density, or <br /> bentonite. Areas with deficiencies shall be reworked by CONTRACTOR,until acceptable <br /> measurements are obtained at no additional cost to CC&V. <br /> Section 02200 Page 12 of 16 May 9,2012 <br /> Earthworks Revision 1 <br />