Laserfiche WebLink
ameO <br /> 2. CONTRACTOR shall process, place and compact the Soil Liner Fill to achieve a <br /> coefficient of permeability of less than 1x10-6 cm/sec, measured according to ASTM <br /> Method D5084, Method D. Any Soil Liner Fill not meeting the permeability specification <br /> shall be removed and replaced with material meeting the permeability specification, at no <br /> additional cost to CC&V. <br /> 3. CONTRACTOR shall place and compact the Soil Liner Fill in loose lifts such that the <br /> compacted lift thickness is a minimum of 12-inches. <br /> 4. CONTRACTOR shall compact the Soil Liner Fill to at least 95 percent of the maximum <br /> dry density as determined by the Standard Proctor density test (ASTM D698). The <br /> moisture content shall be within +3% to -2% of the optimum moisture content. Both <br /> moisture and density shall be uniform throughout the lift. If the Soil Liner Fill cannot be <br /> conditioned to meet the placement specifications, the material shall be removed and <br /> replaced with new Soil Liner Fill at the CONTRACTOR's expense. The <br /> CONTRACTOR shall reduce the clod size of the soil liner fill to a size that is acceptable to <br /> the CERTIFYING ENGINEER, the method by which will be approved by <br /> CERTIFYING ENGINEER and MANAGER prior to implementation. <br /> 5. The moisture content of the Soil Liner Fill shall be uniform throughout prior to and during <br /> compaction of the material. CONTRACTOR shall be responsible for meeting moisture <br /> content and compaction SPECIFICATIONS. If the Soil Liner Fill cannot be conditioned to <br /> meet the placement SPECIFICATIONS, the material shall be removed and replaced with <br /> new Soil Liner Fill at no additional cost to CC&V. MANAGER may require <br /> CONTRACTOR to moisture condition Soil Liner Fill at stockpile at least 24 hours prior to <br /> the Soil Liner Fill being placed. <br /> 6. CONTRACTOR shall place Soil Liner Fill to form a continuous monolithic material. If a <br /> lift of compacted Soil Liner Fill dries out during placement operations, CONTRACTOR <br /> shall scarify, moisture condition the dry soil and recompact the lift. If a lift of compacted <br /> Soil Liner Fill becomes overly wet due to precipitation or over watering,CONTRACTOR <br /> shall allow the wet soil to dry to the specified moisture content range before recompaction <br /> of fill and placement of geosynthetic materials. <br /> 7. CONTRACTOR shall assist CQA Monitor in obtaining soil samples for CQA testing. <br /> Soil Liner Fill sampling shall be scheduled by CQA Monitor with CONTRACTOR to <br /> facilitate CQA field testing. <br /> 8. CONTRACTOR shall maintain Soil Liner Fill stockpile areas in a free-draining condition. <br /> The CONTRACTOR will maintain Soil Liner Fill stockpiles and Soil Liner Fill placed <br /> within the limits of the mill site earthworks project to prevent the drying out of the surface. <br /> 9. CONTRACTOR shall compact corners and other areas inaccessible to driven compaction <br /> equipment using hand-operated 500-pound vibratory plate or vibratory smooth-drum <br /> compaction equipment approved by MANAGER and CERTIFYING ENGINEER. <br /> 10. CONTRACTOR shall trim the surface of the Soil Liner Fill to the design grades shown on <br /> the DRAWINGS. <br /> I I. CONTRACTOR shall roll the surface of the Soil Liner Fill with a smooth drum roller to <br /> remove ridges and surface irregularities greater than 0.5 inches in height. CERTIFYING <br /> ENGINEER shall determine if surface preparation is sufficient to place geomembrane. On <br /> Section 02200 Page 11 of 16 May 9,2012 <br /> Earthworks Revision 1 <br />