My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> PART 3.0 LINES OF COMMUNICATION <br /> The CQA Monitor shall be capable of direct communication with the MANAGER, DESIGN <br /> ENGINEER, CERTIFYING ENGINEER and CONTRACTOR at all times. Deficiencies that can be <br /> easily remedied, such as unsatisfactory test results, will be dealt with directly between the CQA Monitor, <br /> INSTALLER,and/or CONTRACTORS. <br /> If there is a disagreement among the DESIGN ENGINEER, CERTIFYING ENGINEER and/or <br /> MANAGER that can not be resolved among themselves, MANAGER shall present the matter to CC&V <br /> with MANAGER related recommendations and CC&V shall decide the matter with such decision being <br /> final. <br /> PART 4.0 DEFICIENCIES <br /> When deficiencies (items that do not meet project requirements) are discovered, the CQA Monitor shall <br /> immediately determine the nature and extent of the problem and notify the INSTALLER or <br /> CONTRACTOR. If unsatisfactory test results identify a deficiency, additional tests will be performed to <br /> define the extent of the deficient area. <br /> The INSTALLER or CONTRACTOR shall correct the deficiency to the satisfaction of the CQA <br /> Monitor. If the CONTRACTOR is unable to correct the problem, the CQA Monitor will notify the <br /> MANAGER and CERTIFYING ENGINEER who will assist in problem resolution. If the solution <br /> involves a design revision,the DESIGN ENGINEER shall also be contacted. <br /> The corrected deficiency shall be retested and/or approved by the MANAGER and CERTIFYING <br /> ENGINEER before any additional related work is performed by the INSTALLER or CONTRACTOR. <br /> All retests and related documentation shall be recorded by the CQA Monitor and included in the final <br /> Construction Certification Report. <br /> PART 5.0 MEETINGS <br /> This section identifies and describes the meetings to be held during the course of the construction. <br /> Meetings shall be held in order to clearly define construction activities and goals in order to facilitate <br /> construction. <br /> 5.01 PRECONSTRUCTION MEETING: <br /> The MANAGER will hold a preconstruction meeting at the site prior to the start of construction. The <br /> DESIGN ENGINEER, MANAGER, CERTIFYING ENGINEER, CQA Monitor, INSTALLER, <br /> CONTRACTOR, and others designated by the MANAGER shall attend this meeting. The purpose of <br /> this meeting will be to: <br /> ■ review the construction DRAWINGS,CQA Plan,and project SPECIFICATIONS; <br /> ■ define the responsibilities of each party; <br /> ■ define lines of communication and authority; <br /> • review method of documentation,testing procedures,and reporting inspection data; <br /> Section 01400.2 Page 4 of 11 May 9,2012 <br /> Geosynthetic CQA Plan Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.