My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> ■ establish testing protocols and procedures for correcting and documenting construction <br /> deficiencies; <br /> ■ discuss any changes that may be needed to ensure that construction will be completed in <br /> compliance with the design;and <br /> ■ This meeting will be documented by the MANAGER or his designee and copies distributed <br /> to all parties. <br /> 5.02 PROGRESS MEETINGS: <br /> The MANAGER will hold a daily progress meeting, either before the start of work or at the completion of <br /> work. At a minimum, this meeting will be attended by the CQA Monitor, INSTALLER and <br /> CONTRACTOR. The purpose of this meeting will be to: <br /> ■ review all the previous day's accomplishments and activities; <br /> ■ review scheduled work location and activities for the day;and, <br /> ■ discuss any problems or potential construction problems. <br /> ■ This meeting will be documented by the CQA Monitor. <br /> 5.03 DEFICIENCY MEETINGS: <br /> Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a minimum, <br /> these meetings will be attended by the CQA Monitor and INSTALLER or CONTRACTOR. If the <br /> problem relates to a design issue, the MANAGER, DESIGN ENGINEER and CERTIFYING <br /> ENGINEER should also be present. The meeting will be documented by the CQA Monitor. <br /> PART 6.0 GEOSYNTHETICS CONSTRUCTION QUALITY ASSURANCE <br /> Construction of the Mill Earthworks project or specified geosynthetics must be in compliance with the <br /> design plans and SPECIFICATIONS. CC&V shall implement a CQA monitoring and testing program to <br /> ensure construction compliance by the CONTRACTOR. The quality assurance program shall consist of <br /> reviewing CONTRACTOR quality control submittals, material conformance testing, construction <br /> monitoring and testing. <br /> The types of geosynthetics used in the mill site construction include polyethylene pipe, geomembrane, <br /> geotextile, geogrid, and geosynthetic clay liner (GCL). These geosynthetics are defined in the project <br /> SPECIFICATIONS. Prior to and during construction, these geosynthetics shall be sampled and tested to <br /> determine if they meet project SPECIFICATIONS. All tests shall be performed in a geosynthetics <br /> laboratory approved by the MANAGER and CERTIFYING ENGINEER. <br /> 6.01 REVIEW QUALITY CONTROL SUBMITTALS: <br /> Prior to geosynthetic installation, the CQA Monitor shall review the INSTALLER'S quality control <br /> submittals to evaluate or confirm that these materials meet project requirements. The CQA Monitor shall <br /> review the QC submittals that are outlined in Section 2776 (Geomembrane), Section 2776.1 (Geogrid), <br /> Section 2776.2(Geosynthetic Clay Liner),and Section 02777(Geotextile)of the SPECIFICATIONS. <br /> Section 01400.2 Page 5 of 11 May 9,2012 <br /> Geosynthetic CQA Plan Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.