My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> ■ observe prepared subgrade prior to geosynthetic deployment; <br /> ■ monitor and document geosynthetic material placement, trial seam testing, non-destructive <br /> testing,seaming and repair operations,and destructive testing; <br /> ■ identify seam samples for CQA destructive testing; <br /> • assure that testing equipment used, and tests performed are conducted according to project <br /> SPECIFICATIONS and industry standards; <br /> ■ perform or observe,document,and report test results to MANAGER as required; <br /> ■ report any deficiencies to MANAGER that are not corrected to the satisfaction of the CQA <br /> Monitor,including design or project SPECIFICATION changes;and <br /> ■ prepare a Construction Certification Report describing the construction, any deviations from <br /> SPECIFICATIONS or, DRAWINGS and details, details of all field and laboratory details, <br /> subgrade acceptance forms,test data, tests results (both laboratory and field), QC submittals, <br /> geomembrane panel layout as-built prepared by the CQA Monitor, professional certification <br /> that construction was completed in compliance with the DRAWINGS and <br /> SPECIFICATIONS. The report will be signed and sealed by the CERTIFYING <br /> ENGINEER registered in the State of Colorado. <br /> 2.06 GEOSYNTHETICS MANUFACTURER: <br /> The Geosynthetics Manufacturer, also referred to as the "MANUFACTURER", is responsible for <br /> production of the geosynthetic components outlined in this plan. Each MANUFACTURER must verify <br /> prior to construction that the MANUFACTURER can produce material that meets the requirements <br /> outlined in project SPECIFICATIONS. <br /> 2.07 GEOSYNTHETICS INSTALLATION CONTRACTOR: <br /> The Geosynthetics Installation Contractor, also referred to as the "CONTRACTOR" or "INSTALLER", <br /> is responsible for installation of the geosynthetic components, as outlined in the project <br /> SPECIFICATIONS. <br /> The INSTALLER must meet the requirements outlined in the project SPECIFICATIONS. <br /> The INSTALLER will be responsible for storage, handling, deploying, temporary geomembrane <br /> anchoring, seaming, repairs and non-destructive testing, in accordance with the project plans, <br /> SPECIFICATIONS and the INSTALLER's internal quality control program. It is the INSTALLER's <br /> responsibility to see that all submittals are received as outlined in the project SPECIFICATIONS. <br /> 2.08 EARTHWORKS CONTRACTOR: <br /> The Earthworks Contractor, also referred to as "CONTRACTOR" is responsible for proper delivery and <br /> placement of earthwork components as outlined in the project SPECIFICATIONS. <br /> Section 01400.2 Page 3 of 11 May 9,2012 <br /> Geosynthetic CQA Plan Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.