My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> ■ preconstruction coordination with the CQA Monitor to ensure that the CQA Monitor has <br /> performed similar reviews of the design DRAWINGS and project SPECIFICATIONS to <br /> ensure that the CQA Plan can be implemented; <br /> ■ coordination of all construction activities associated with the various CONTRACTOR(S); <br /> ■ scheduling and coordinating construction activities with required CQA testing and activities; <br /> ■ overseeing the construction quality control operations performed by the CONTRACTOR(S); <br /> ■ approve specific corrective measures to be implemented during construction when deviations <br /> from the SPECIFICATIONS occur; <br /> ■ ensure that required quality control testing has been performed in accordance with the CQA <br /> Plan and to the satisfaction of the CQA Monitor; and <br /> ■ ensure that the CQA personnel are provided with all documentation required in the CQA Plan <br /> and project SPECIFICATIONS. <br /> 2.03 DESIGN ENGINEER: <br /> In this CQA Plan the DESIGN ENGINEER refers specifically to AMEC. The DESIGN ENGINEER is <br /> the individual or firm responsible for the design and preparation of the project construction DRAWINGS <br /> and project SPECIFICATIONS. The DESIGN ENGINEER is responsible for approving all design and <br /> project SPECIFICATION changes,modifications,or clarifications encountered during construction. <br /> 2.04 CERTIFYING ENGINEER: <br /> In this plan, CERTIFYING ENGINEER refers specifically to AMEC. CERTIFYING ENGINEER is <br /> the individual or firm responsible for certifying the construction was performed in compliance with the <br /> DRAWINGS and SPECIFICATIONS. MANAGER and CERTIFYING ENGINEER will be responsible <br /> for the resolution of all quality assurance issues. <br /> 2.05 CONSTRUCTION QUALITY ASSURANCE MONITOR: <br /> The Construction Quality Assurance Monitor, also referred to as the "CQA Monitor", is the firm or <br /> individual responsible for performing the CQA tasks outlined in this plan. The CQA Monitor is the official <br /> CQA representative of CC&V and has the responsibility of overseeing the CQA aspects of the project. In <br /> this CQA Plan the CQA Monitor is associated with the CERTIFYING ENGINEER and refers <br /> specifically to AMEC. The CQA Monitor has the authority to stop any aspect of the work that is not in <br /> compliance with the CQA Plan. Work would then be resumed once corrective action has been approved <br /> by the MANAGER and CERTIFYING ENGINEER. The specific responsibilities of the CQA Monitor <br /> include: <br /> ■ review the design DRAWINGS, project SPECIFICATIONS, and related guidance <br /> documents; <br /> ■ review all CONTRACTOR QC submittals and make appropriate recommendations; <br /> ■ observe geosynthetic material delivery,unloading,and storage; <br /> ■ obtain and test geosynthetic conformance samples during geosynthetics manufacture; <br /> Section 01400.2 Page 2 of 11 May 9,2012 <br /> Geosynthetic CQA Plan Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.