My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> SECTION 01400.2 GEOSYNTHETIC CONSTRUCTION QUALITY ASSURANCE(CQA)PLAN <br /> PART 1: INTRODUCTION <br /> This plan addresses the construction quality assurance (CQA) procedures for the installation of the <br /> geosynthetic components used for the construction of the Mill Site Earthworks Project, Teller County, <br /> Colorado. This program has been developed to assure that the construction of the geosynthetic <br /> components are in compliance with the project SPECIFICATIONS and to demonstrate that the regulatory <br /> requirements for the construction are achieved. <br /> The objective of this plan is to assure that proper materials, construction techniques, and procedures are <br /> followed by the CONTRACTOR and that the intent of the design is met. This program also intends to <br /> identify problems that may occur during construction and provide the means for resolution of these <br /> problems. <br /> This program addresses quality assurance, not quality control. This CQA Plan is independent of the <br /> quality control (QC) programs conducted by the MANUFACTURERS, INSTALLERS, and <br /> CONTRACTORS. The intent of the CQA Plan is to provide independent third party verification and <br /> testing, to demonstrate that the INSTALLER and CONTRACTORS have met their obligations in the <br /> supply and installation of geosynthetic materials according to the design, project SPECIFICATIONS, <br /> contractual and regulatory requirements. Quality control is provided by the MANUFACTURERS, <br /> INSTALLERS, and CONTRACTORS and refers to those actions taken by them to ensure that their <br /> materials and workmanship meet the requirements of the plans and project SPECIFICATIONS. <br /> PART 2.0 DESCRIPTION OF PARTIES TO CONSTRUCTION QUALITY ASSURANCE <br /> The following section provides descriptions of the parties to this CQA plan including their responsibilities <br /> and qualifications. <br /> 2.01 CC&V: <br /> In this CQA Plan CC&V refers specifically to Cripple Creek & Victor Gold Mining Company. CC&V <br /> owns and operates site and mill. <br /> 2.02 MANAGER: <br /> In this CQA Plan the MANAGER refers specifically to the individual appointed by the Cripple Creek & <br /> Victor Gold Mining Company. The MANAGER is the official representative of CC&V responsible for <br /> all construction activities including oversight and direction during construction. The MANAGER is also <br /> responsible for coordinating construction and CQA activities for the project. <br /> The MANAGER shall serve as communications coordinator for the project initiating preconstruction and <br /> resolution meetings. As communications coordinator,the MANAGER shall serve as a liaison between all <br /> parties involved in the project to ensure that ongoing communications are maintained. The MANAGER <br /> and CERTIFYING ENGINEER shall also be responsible for the resolution of all CQA issues that arise <br /> during the installation of the geosynthetics. <br /> Duties for this position include the following: <br /> ■ review and approval of design DRAWINGS and project SPECIFICATIONS for all <br /> geosynthetic components of the mill site earthworks project; <br /> Section 01400 2 Page 1 of 11 May 9,2012 <br /> Geosynthetic CQA Plan Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.