My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-11_REPORT - C1981041
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2014-02-11_REPORT - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 12:53:06 PM
Creation date
2/11/2014 12:24:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
2/11/2014
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2013
Permit Index Doc Type
Annual Reclamation Report
Email Name
MPB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. <br />-9- 2013 Annual Reclamation Report <br />11 and then top soil pile area was graded and seeded. <br />Approximately 3.0 acres were re- disturbed and re- seeded during <br />the reclamation the North Portal sedimentation control features. <br />Portions of the Upper Diversion Ditch, approximately 1.4 acres, and <br />the remnants of Top Soil Pile #2, approximately 0.3 acres, were <br />approved as permanent features on August 12, 2012 with PR -5. <br />Area — 2.0 acres <br />3.0 acres (re- disturbed) <br />Date — October 2012 <br />Seed Mix — "Seed Mix, Table 14 -8 ", Upland Components <br />23. Substations B - Superstructures, fences, slabs and components <br />removed during 2002. Graded to approximate original contours <br />and re- seeded. Located in the SW'/ Section 35, T1 OS, R98W, 6th <br />P.M. <br />Area - 0.3 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />24. 2 West Portals - Substation of portal areas. Reference Exhibit 58. <br />Located in the NE' /, Section 11, T11S, R98W, 6th P.M. <br />Area - 0.7 acres <br />Date - December 2001 <br />Seed Mix - "Seed Mix, Table 14 -6" <br />25. Cameo Refuse Disposal Area Topsoil Piles - These piles were <br />used for top soiling the CRDA2 during final reclamation activities. <br />Located in the SE' /, Section 28, T1 OS, R98W, 6th P.M. <br />Area - 2.9 acres <br />Date - April 2002 <br />Seed Mix - "Seed Mix, Table 14 -13 ", Upland Components <br />26. Conveyor Corridor - The conveyor corridor, from the Xcel culvert <br />north to Haul Road #3 was graded to approximate original contours <br />and re- seeded. A total of 0.5 acres in this area achieved final <br />Phase III Bond Release with SL -5, approved on November 5, 2009 <br />and the remaining 2.2 acres achieved final Phase III Bond Release <br />with SL -7, approved on April 26, 2011. Located in SE' /, Section 27 <br />and NW' /, Section 34, T10S, R98W, 6th P.M. <br />Area - 2.7 acres <br />Date - July 2003 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Lowland Components <br />Phase III Bond Release - 2.7 acres <br />27. Conveyor Corridor - The conveyor corridor, from the Xcel culvert <br />south to Transfer Building #2 and east of Colorado River where <br />conveyor tube crossed river was graded to approximate original <br />
The URL can be used to link to this page
Your browser does not support the video tag.