Laserfiche WebLink
Snowcap Coal Company, Inc. <br />-8- 2013 Annual Reclamation Report <br />0.6 acres (re- disturbed) <br />Date — October 2012 <br />Seed Mix — "Seed Mix, Table 14 -8 ", Upland Components <br />21. Access Road and Power lines to No. 2 West Portals - By <br />agreement with the Bureau of Land Management, the access road <br />was left in place. The Power line reclamation was finished during <br />2002. <br />Area - 3.8 acres <br />Date - July 2002 <br />Seed Mix - No backfilling or seeding required <br />22. Roadside North Portal Mine Facilities and Stockpile Area - All <br />structures, materials and facilities were removed. The portal <br />decline was filled and the area was returned to approximate original <br />contours and then reseeded. Located in the SW'/ Section 27, <br />T10S, R98W, 6th P.M. <br />Area - 24.1 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />Approximately 0.1 Acres along the north bank of Coal Creek was <br />reseeded after it was re- disturbed creating access for equipment <br />while building the rock check structure in Coal Creek. <br />Area - 0.1 acre (Re -seed) <br />Date - August 2003 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />The northwest section of the North Portal, approximately 3.8 acres, <br />was reseeded due to poor establishment of vegetation from the <br />2002 seeding. <br />Area - 3.8 acres (Re -seed) <br />Date - December 2005 <br />Seed Mix - "Salt Tolerant Seed Mix, Table 14 -15" <br />All structures at the "G" Substation were removed and area was <br />returned to approximate original contours and seeded. <br />Area - 0.5 acres <br />Date - September 2008 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components (Needle <br />and Thread was not available, so Indian Rice Grass was increased <br />by 1 lb/acre, which was approved by Dan Mathews) <br />Pond 13, a portion of the old upper diversion ditch and the flume <br />area at the end of the upper diversion ditch were filled, regraded <br />and seeded. Material from Top Soil Pile #1 was re- distributed at <br />Pond 13, flume area, CBA #1, Ponds 6 & 10 and portions of Pond <br />