Laserfiche WebLink
Snowcap Coal Company, Inc. -7- 2013 Annual Reclamation Report <br />18. Cameo Refuse Disposal Area No. 1 - Re- contoured upper bench, <br />regraded the top of the pile, covered all slopes, benches and the <br />top of the pile with 24 inches of material. Established collection <br />ditches and rip- rapped the ditches in accordance with the <br />reclamation plan. This pile was seeded during April 2002. <br />Approximately one (1) acre was re- disturbed in December 2009 on <br />top of CRDA #1 as a lay down area for coal refuse delivered from <br />McClane Canyon Mine and remaining SCC coal fines clean up. <br />The one acre of re- disturbance was reclaimed and reseeded in <br />September 2010. Located in the SE' /, Section 28, T1 OS, R98W, <br />6th P.M. <br />Area - 14.8 acres; 1 acre (reseed) <br />Date - April 2002; September 2010 (reseed) <br />Seed Mix - "Seed Mix, Table 14 -13 ", Upland Components <br />"Seed Mix, Table 14 -8 ", Upland Components (reseed) <br />19. Cameo Refuse Disposal Area No. 2 - The final reclamation of this <br />refuse pile included covering and top soiling the upper benches and <br />the top of the pile. Also a new diversion ditch was constructed just <br />above the pile. The Old Upper diversion ditch was reclaimed and <br />restored to approximate original contours and then reseeded. <br />Located in the SE' /, Section 28 and the SW' /, Section 27, T10S, <br />R98W, 6th P.M. <br />Area - 20.2 acres <br />Date - April 2002 for CRDA2 and November 2002 for Upper <br />Diversion <br />Seed Mix - For CRDA2 - "Seed Mix, Table 14 -13 ", Upland <br />Components <br />Seed Mix - For Upper Diversion - "Seed Mix, Table 14 -8 ", Upland <br />Components <br />20. Cameo Borrow Area No. 2 - Material was excavated from CBA2 <br />for the covering of the CRDA1. Approximately 5.1 acres was seed <br />in April 2002, however a further disturbance will be needed here at <br />the removal of Pond 11. Located in the SE' /, Section 28, T1 OS, <br />R98W, 6th P.M. <br />Area - 2.7 acres <br />Date - April 2002 <br />Seed Mix - "Seed Mix, Table 14 -13 ", Upland Components <br />Pond 11 was filled, regraded, top - soiled and seeded. <br />Approximately 0.6 acres were re- disturbed and re- seeded during <br />the reclamation of Pond 11. The acres associated with the <br />realignment of Coal Gulch, approximately 1.4 acres, were approved <br />as permanent features on August 12, 2012 with PR -5. <br />Area — 1.2 acres <br />