My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-11_REPORT - C1981041
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2014-02-11_REPORT - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 12:53:06 PM
Creation date
2/11/2014 12:24:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
2/11/2014
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2013
Permit Index Doc Type
Annual Reclamation Report
Email Name
MPB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. <br />-10- 2013 Annual Reclamation Report <br />contours and seeded. A total of 1.3 acres in this area achieved <br />final Phase III Bond Release with SL -5, approved on November 5, <br />2009. Located in SE' /, Section 27 and NW' /, Section 34, T10S, <br />R98W, 6th P.M. <br />Area - 1.6 acres <br />Date - March 2004 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Lowland Components <br />Phase III Bond Release - 1.3 acres <br />28. Substations A - Superstructures, fences, slabs and components <br />removed during 2007. Graded to approximate original contours <br />and re- seeded. Located in the SE'/ Section 34, T1 OS, R98W, 6th <br />P.M. <br />Area - 0.2 acres <br />Date - August 2007 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />29. Roadside South Portal Mine Facilities and Stockpile /Prep Plant <br />Area and Conveyor Tunnel Under 1 -70 - The Roadside South <br />Portal Mine Facilities, Stockpile and Prep Plant areas where <br />reclaimed as per approved Permit Revision #3 (PR -3). 13.5 acres <br />were reclaimed during the last two quarters of 2007. These acres <br />include all back filled and graded areas along with buildings and <br />asphalt areas that were approved for retention through PR -3. The <br />east end of the Conveyor Tunnel was backfilled and filled with a 2 <br />foot concrete plug. Due to inclement weather and frozen soils, <br />seeding was postponed until the 1St quarter of 2008. These 13.5 <br />acres achieved final Phase III Bond Release with SL -6 which was <br />approved on December 14, 2010. Located in the SW'/ & SE'/ <br />Section 34, T1 OS, R98W, 6th P.M. <br />Area - 13.5 acres reclaimed <br />9.6 acres backfilled and graded <br />6.4 acres top soiled <br />Date - December 2007 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />Phase III Bond Release - 13.5 acres <br />Pond 8 and surrounding area was backfilled, graded to final <br />contours and seeded in 2011. Located in the SW'/ & SE'/ Section <br />34, T1 OS, R98W, 6th P.M. <br />Area - 0.5 acres <br />Date - October 2011 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />Pond 9 was backfilled, graded to final contours and seeded in <br />2013. Located in the SW'/ Section 34, T1 OS, R98W, 6th P.M. <br />Area - 0.4 acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.