My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (7)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:49 PM
Creation date
2/11/2014 10:50:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 1 of 2 doc 1of3 Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Mill Site Earthworks Project <br />Final Report ameO <br />Quality Assurance Monitoring &Test Results <br />January 31, 2014 <br />LIST OF APPENDICES <br />Appendix A <br />Record Drawings <br />Record Drawing No. 1 of 4 General Composite Overview <br />Record Drawing No. 2 of 4 Secondary Underdrain As -built <br />Record Drawing No. 3 of 4 Top of Soil Liner Fill As -Built <br />Record Drawing No. 4 of 4 Mill Site Earthworks Geomembrane As -built <br />Appendix B <br />Photographic Documentation <br />Appendix B.1 Photograph Log <br />Appendix B.2 Construction Photographs <br />Appendix C <br />Schedule of AMEC Field Personnel <br />Appendix D <br />Weekly Reports <br />Appendix E <br />Project Specifications <br />Appendix F <br />Surveyor's Certificate <br />Appendix G <br />Geomembrane Subgrade Acceptance Forms <br />Appendix H CQA Laboratory Test Results <br />Appendix H.1 Grain Size Distribution, Moisture Content, and Atterberg Limits <br />Appendix H.2 Compaction Tests <br />Appendix H.3 Soil Liner Fill Permeability Tests <br />Appendix I Geomembrane Quality Control Documents and Inventory <br />Appendix 1.1 Geomembrane Inventory Control <br />Appendix 1.2 Resumes of Installation Personnel <br />Appendix 1.3 Geomembrane Resin Quality Control Certificates <br />Appendix 1.4 Geomembrane Roll Quality Control Certificates <br />Appendix 1.5 Welding Rod Quality Control Certificates <br />Appendix 1.6 Geotextile Roll Quality Control Certificates <br />Appendix J Geomembrane Installation Observations <br />Appendix J.1 Geomembrane Deployment Summary <br />Appendix J.2 Geomembrane Trial Seam Summary <br />Appendix J.3 Geomembrane Fusion /Extrusion Welding Summary <br />Appendix J.4 Geomembrane Defect/Repair Summary <br />Appendix J.5 Geomembrane Destructive Testing Summary <br />Appendix J.6 Geomembrane Non - Destructive Testing Summary <br />Appendix J.7 Geomembrane Acceptance Notifications <br />Appendix K Geomembrane Conformance Test Results <br />Appendix L Tensiometer Certification <br />Appendix M Underground Working Observations <br />Appendix M.1 Summary and Layout <br />Appendix M.2 Record Drawings <br />Appendix M.3 Concrete Test Results <br />Appendix M.4 Geogrid Quality Control Certificates <br />Appendix M.5 Geogrid Conformance Test Results <br />
The URL can be used to link to this page
Your browser does not support the video tag.