Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Mill Site Earthworks Project <br />Final Report amec kO <br />Quality Assurance Monitoring &Test Results <br />January 31, 2014 <br />LIST OF ISSUED FOR CONSTRUCTION DRAWINGS <br />Drawing Title <br />A000 Mill Site Earthworks Title Sheet <br />A040 Historic Underground Workings <br />A045 Underground Working Remediation Typical Details <br />A050 Stormwater Control <br />A100 Overburden Storage Area Top of Geomembrane Grading Surface Plan View <br />A120 Overburden Storage Area Limits of Soil Liner Fill Placement Plan View <br />A150 Overburden Storage Area Top of Geomembrane Grading Surface Isophach Plan <br />View <br />A160 Overburden Storage Area Containment Berm Plan and Profile <br />A170 Overburden Storage Area Pumpback Tube Plan View and Details <br />A200 Overburden Storage Area Finished Grade Surface Plan View <br />A250 Overburden Storage Area Finished Grade Surface Isopach Plan View <br />A270 Overburden Storage Area Limits of GCL <br />A300 Overburden Storage Area & Future Mill Platform Grading Sections and Details Sheet <br />1 of 3 <br />A310 Overburden Storage Area & Future Mill Platform Grading Sections and Details Sheet <br />2of3 <br />A320 Overburden Storage Area & Future Mill Platform Grading Sections and Details Sheet <br />3of3 <br />A400 Overburden Storage Area Alignment Plan View <br />A410 Overburden Storage Area Mill Access Roads Plan and Profile <br />A420 Overburden Storage Area South Perimeter Road Plan and Profile <br />A425 Overburden Storage Area Sections and Details <br />A430 Overburden Storage Area Construction Road UM Plan and Profile <br />A440 Overburden Storage Area Construction Road Horizontal Alignment Data <br />A500 Conceptual LOB Haul Road Stormwater Management <br />iv <br />