Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Mill Site Earthworks Project <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />January 31, 2014 <br />• John Deere 35D Excavator <br />• Caterpillar 312 Excavator <br />• John Deere 200 Excavator <br />• Caterpillar 304 Excavator <br />• Caterpillar 330 Excavator <br />• Caterpillar 345 Excavator <br />• Caterpillar 375 Excavator <br />• Caterpillar 385 Excavator <br />• John Deere 850 Excavator <br />• John Deere 120 Excavator <br />• Tamrock Track Mounted Drill <br />• Sandvik Track Mounted Drill <br />• Caterpillar 740 Haul Truck <br />• Caterpillar 773 Haul Truck <br />• Caterpillar 777 Haul Truck <br />• Water Trucks <br />ameO <br />Weather data for the Mill Site Earthworks Project construction activities from the period <br />of October 2011 through December 2012 are presented in Table 2. <br />2.1 Underground Workings Remediation <br />Historic underground workings within the footprint of the Mill Site Earthworks Project <br />were remediated following the recommended remediation plans presented on IFC <br />Drawing No. A45 in the Drawings section. <br />A layout and summary of the underground workings remediation is presented in <br />Appendix M.1. This table shows the working identification, location (northing and <br />easting), type of working, remediation quantities, and comments. The following <br />provides a summary of the general remediation methods for the underground workings <br />within the Mill Site Earthworks Project footprint. <br />2.1.1 Remediation of Shafts, Stopes, and Shallow Surface Pits <br />The following is a general approach used to remediate isolated shafts and shallow <br />surface pits: <br />