Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Mill Site Earthworks Project <br />Final Report ameO <br />Quality Assurance Monitoring &Test Results <br />January 31, 2014 <br />2.0 SUMMARY OF EARTHWORK CONSTRUCTION <br />Earthworks activities associated with the Mill Site Earthworks Project included the <br />following: <br />• Site grading, including cut and placement of OVF <br />• Secondary underdrain construction, including trench excavation, installation of <br />12 oz. /yd.2 geotextile, placement of UFM and placement of SSF <br />• Underground workings remediation <br />• Subgrade preparation <br />• SLF installation, placement and compaction, depth verification testing, and <br />preparation of SLF surface for geomembrane deployment <br />• Geomembrane liner system installation <br />• DCF placement above the geomembrane layer <br />Ames generally used the following equipment during construction: <br />• Caterpillar D6 Low Ground Pressure (LGP) Dozer <br />• Caterpillar D7 LGP Dozer <br />• Caterpillar D8 LGP Dozer <br />• Caterpillar D9 LGP Dozer <br />• Caterpillar D9 Dozer <br />• Caterpillar D10 Dozer <br />• John Deere Skidsteer <br />• Caterpillar 750 Skidsteer <br />• Bobcat Skidsteer <br />• Caterpillar 950 Loader <br />• Caterpillar 988 Loader <br />• Caterpillar 992 Loader <br />• Caterpillar 993 Loader <br />• John Deere 544 Loader <br />• Caterpillar 14H Motor Grader <br />• Caterpillar CS563 Compactor <br />• Caterpillar CS663 Compactor <br />