Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 046 Page 2 of 3 <br />EQUIPMENT HAUL DISTANCE and Time . <br />Nearest Major City or Town within project area region: <br />Total one -way travel distance: <br />Average Travel Speed: <br />Total Non- Roadable Mob!Demob Cost <br />two round trips with haul rig: <br />Total Roadable Mob/Demob Cost' * <br />** one round trip. no haul rig: <br />Transvortation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non- Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.40 j <br />0.40 <br />0.40 <br />0.40 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.80 ! <br />0.80 <br />HAYDEN <br />_ 10.00 miles <br />?5.00 mph <br />53,533.70 <br />$44.41 <br />Total job tune: 3.60 Hours <br />Total job cost: $3,578.11 <br />CIRCES Cast &tiinating SofiwLrc <br />