Laserfiche WebLink
EQUIPMENT MOBILIZATIONIDEMOBILIZATION <br />Task description: Mob[Demobilization for Pond Removal <br />Site: Hayden Gulch Loadout Permit action: RN4 <br />PROJECT IDENTIFICATION <br />"Task #: 046 State: Colorado _ <br />Date: L, i iM B County: Routt <br />User: ME <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Page 1 of 2 <br />Pernit'Job -4: 01992051 <br />Abbrex iation: None <br />Filename: C081 -046 <br />Shift basis: 1 per day _ <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCIC TRACTOR, 6X4, DIESEL POWERED. <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 0T, AND 100T) <br />Cost Breakdown: <br />Available Rig Caap cities _ <br />0 -25 Tons <br />26-50 Tons <br />M+ Tons <br />Ownership Cost-Hour: <br />516.63 <br />I $18.37 ! <br />522.33 <br />Operating Costiffour: <br />$44.33 <br />i $46.13 <br />S50.07 <br />Operator Costil four: <br />S27.66 <br />-] $27.66 <br />527.66 <br />_ <br />Helper Cost Hour: <br />_ _ $0.00 <br />1 $35.39 ' <br />$25.39 <br />Total Unit Costilfour: <br />588.67 <br />S 117.55 <br />S1225.45 <br />NON ROADABLE EQUIPMENT: <br />j Machine <br />I - Weighu <br />Owner ship <br />Haul Rig Fleet <br />Haul Tri p <br />Return Trip <br />j DOT Permit <br />Description <br />Unit <br />Costlm unit <br />Cosuhriunit Size <br />Costlhr.," <br />i Cost:I-,rl fleet <br />i Cost,' fleet <br />(TONS) <br />t fleet <br />; <br />r Cat D I OT - l OSU <br />1 93.31 - <br />_ <br />S111.83 <br />$125.45 1 <br />$23723 <br />1 $125.45 <br />$500.00 <br />! DriiliBroadcast <br />i 25.00 <br />539.59 <br />$88.67 1 <br />$12S?6 <br />`88.67 <br />$250.00 <br />Secder with Tractor <br />Poxt•er Mulcher <br />7 <br />6.00 <br />ST03 <br />3 1,,%9.67 i 1 <br />$95.70 <br />� $81:.67 <br />i $250.00 <br />! (Reinco 8190) <br />1 <br />I <br />J <br />ROADABLE EQUIPMENT: <br />Machine Description <br />K GV <br />Subtotals: { S461.24 $302.79 1 $1,000.00____ <br />Costltri unit I Fleet Size I Haul Trip 1 Retum 7Ytp <br />Cost; hri fleet Costrhri fleet <br />- - Subtotals: ; - 555.51 l $55.51_._; <br />It cS <br />coat E:t :Is?.2ii3t ssn: wsr:. <br />