Laserfiche WebLink
Page 1 of 2 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: blob /Demobilization for Maintanence and Pond Cleaning <br />Site: Hayden Gulch Loadout Permit Action: RN4 PermidJobl: C1992081 <br />PROJECT IDENTIFICATION <br />Task �: 047 State: Colorado <br />Date: 1/10/2013 County: Routt <br />User: JLE <br />A;er_cy or organization name: DRNvIS <br />EQUIPMENT TRk:'NSPORT RIG COST <br />Abbreviation: None <br />Filename: C081 -047 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Track Tractor Description: GENERIC ON- HIGHWAY "FRUCK TRACTOR. 6 .X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rid Capacities <br />Ownership CostiHour: <br />0 -25 Tons <br />26 -50 Tons f 51+ Tons <br />SI6.63 <br />S18.37 522.33 <br />Operating Cost/'Hour: <br />Operator Cost'Hour: <br />I _ __ S44.38 <br />527.66 <br />_ S46.13 j 550.07 <br />S27.66 $27.66 <br />Helper Cost our <br />$0.00 <br />S25.39 525.39 <br />Total Unit CostiHour: <br />S88.67 <br />( SI 17.55 1 S125.45 <br />NON ROADABLE EQUIPMENT: <br />i Machine <br />in <br />��Veis t' <br />h <br />' O«•ner ship <br />p <br />Haul Rim <br />c, <br />Fleet <br />Haul Trip <br />Return Trip <br />1 DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr /unit <br />Size <br />1 Cosuh / <br />I Cost`hr' fleet <br />Cost/ fleet <br />_ __ <br />(TONS) <br />I <br />fleet <br />i <br />Cat 336D L 10' -6' <br />L 33.23 <br />542.44 <br />S 117.55 <br />1 <br />S1_139.99 <br />$117.55 <br />$250.00 i <br />Stick <br />i <br />Cw D3K LGP - 3P <br />1 9.20 <br />;13.07 <br />SS8.67 <br />1 5 <br />$508.68 <br />1 S- 143.35 <br />I SI250.00 I <br />Subtotals: <br />I $668.67 <br />+ $560.90 i <br />$1,500.00 <br />ROADABLE EOUIPMEN'l': <br />{j RIacilinc Description Total Cost'hr/ unit <br />II e-nuir8_I0c�.(,xI - - nS1.14 <br />Fleet Size i Haul Trip Return Trip <br />'' Costfltri fleet Costhri fleet <br />6 5486.84 5486.84 <br />Subtotals: f---S486.84- $486.84 <br />_ECaC.,..t uin -mthig u_lc:a <br />