Laserfiche WebLink
k I0hiIi 1110i1 stet•t�l'i:' i:t:el C0111'(11 Tali! i 647 Page 1 f-,1 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Toixm within projc;ct area region: _ 13AYDEN <br />Total one -way travel distance: 10.00 miles <br />Average Travel Speed: 25.00 mph <br />Total Non- Roadable Mob/ Demob Cost : $5,321.00 <br />'* two round trips with haul rig: <br />Total Roadabie Mob/Demob Cost ** <br />** one round trip, no haul rig: 5389.+7 <br />Transportation Cvcle Time: <br />JOB TIMI E AND COST <br />Total job time: 3.60 Hours <br />Total job cost: $5.710.4 <br />'!RCHS `_'os+ Es:,-aao-.-.g 2Wt1:1.:e <br />Non- Roadable <br />Equipment <br />Roadable <br />I Equipment <br />Haul Time (Hours): <br />0.40 <br />0.10 <br />Return Time (Hours): <br />0.40 <br />0.40 <br />Loading Time (Hours): <br />0.50 <br />—� NA <br />Unloading Time (Hours): <br />0.50 <br />i NA <br />Subtotals: <br />1.80 <br />0.80 <br />JOB TIMI E AND COST <br />Total job time: 3.60 Hours <br />Total job cost: $5.710.4 <br />'!RCHS `_'os+ Es:,-aao-.-.g 2Wt1:1.:e <br />