My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-17_PERMIT FILE - C1992081 (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2013-12-17_PERMIT FILE - C1992081 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:08 PM
Creation date
1/30/2014 8:49:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
12/17/2013
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Ta.l- den rip tion: Rip TARR <br />Site: Hayden Gulch Loadout Pennit Action: RNA <br />PROJECT IDENTIFIC A T ION <br />"Task #: 501 State: Colorado <br />Date: 1/106013 - - County: Routt - -` - -- <br />User: JL- <br />Agency or organization name: DRMS <br />HOURLY EQUIP'NIENT COST <br />Permit,Job #: C1992081 <br />Abbreviation: None <br />Filename: COSI -501 <br />Basic Machine: Cat D I OT - 10SU_ <br />4.49 <br />Horsepower: <br />574_ <br />- <br />Ripper Attachmcnt: 1 -Shank Ripper <br />_ _ _ <br />Shift Basis: <br />_ <br />1 per day <br />feet <br />Average Dozer Speed: <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />0.25 <br />feet <br />Production per unit area: _ <br />0.761 <br />acres,hour <br />Utilization % <br />i <br />Ownership Cost/Hour: <br />5110.68 <br />NA <br />Acres:`hr <br />Operating Cost/Hour. <br />$183.36 <br />100 <br />Altitude Adj: _ _ <br />Ripper Operating CosrHour. <br />$11.64 <br />100 <br />0.83 <br />Operator CosdHour: <br />$37.41 <br />j NA <br />multiplier <br />Total Unit Cost/Hour: <br />$343.09 <br />Acres %ltr <br />A djusted Hourly Fleet Production: <br />Total Fleet Cost/Hour. <br />$686.17 <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />JOJ <br />Alternate Methods: <br />Seismic: N_A Bank Volume: <br />BCY <br />NA <br />_ _NA <br />Area: 70.60 acres Rip Depth (ft): 3.00 <br />Volume: 338,800 <br />BCY or CCY <br />Source of estimated quantity: <br />Seneca 11 -W Permit <br />Page 25 -1 -19 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />4.49 <br />mph <br />Average Ripping Width: <br />6.74 <br />degrees <br />Average Ripping Length: <br />300.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: _ <br />0.761 <br />acres,hour <br />Job Condition Correction factors <br />Unadjusted I louriy Unit Production: <br />0.761 <br />Acres:`hr <br />Site Altitudc: <br />7,500 <br />feet <br />Altitude Adj: _ _ <br />1.0_0 <br />(CAT HB) <br />.fob Efficiency: � <br />0.83 <br />(1 shift /day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.53 <br />Acres %ltr <br />A djusted Hourly Fleet Production: <br />1.26 <br />Acresriu- <br />t <br />JOJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.