My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-17_PERMIT FILE - C1992081 (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2013-12-17_PERMIT FILE - C1992081 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:08 PM
Creation date
1/30/2014 8:49:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
12/17/2013
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.CCa;)Cr Wun,...;hCCl t_ :�11t'd Trask ;` 507 Page 2 of 2 <br />Cwle Time: <br />Scraper Loading Time: 1.00 Minutes <br />Maneuver and Spread Titre: 0.60 Minutes <br />Job Condition Correction: Site Altitude: 7500 feet <br />_ _ <br />S_craper I <br />_ -_ Push Dozer_ <br />Source <br />1 f 3400.00 <br />.altitude Adj. <br />1.000 <br />NA <br />(CAT HB) ; <br />Selected Number of Scrapers: <br />Job Elliciencv: <br />0.830 1 <br />NA <br />(CAT HB) <br />LCY /Hour <br />Net Correction: <br />0.830 <br />NA <br />Unadjusted unit productiotvltour: 787.33 LCY/14our <br />Travel Time: <br />Optimal Number of Scrapers per push dozer: <br />JOB'i'1N1E AND COST <br />Road Condition: <br />Firm. smooth. rolline. dirt/It- surfaced. watered. maintained 3.0 <br />Fleet size: 2 Team(s) Total job time: <br />Haul Route: <br />Hours <br />Unit cost: S 1.262 /LCY Total job cost: <br />$25,695.21 <br />— i - - -- - -- - �- - - - - <br />J Seg # Haul Distance (Ft) 44 Grade <br />- - - - -- <br />( Roll. Res <br />� <br />Total Res Velocity (fpm) <br />T <br />Travel ime <br />(thin) <br />1 3400.00 <br />1 -4.00 <br />3.00 <br />-1.00 1 2972 <br />1.18 <br />Haul Time: 1.18 minutes <br />Retiirn Rnute- <br />Seg # i Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res Velocity (fpm) Travel Time <br />( %) ( i (min) <br />1 f 3400.00 <br />4.00 <br />3.00 <br />7.00 i 2240 j 1.64 <br />Return Time: <br />1.64 <br />minutes <br />Total Scraper team cycle tithe: <br />4.42 <br />minutes <br />.Adjusted for job conditions: <br />653.48 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />653.48 <br />LCY /Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />1,306.97 <br />LCY /Hour <br />Unadjusted unit productiotvltour: 787.33 LCY/14our <br />Optimal Number of Scrapers per push dozer: <br />JOB'i'1N1E AND COST <br />Fleet size: 2 Team(s) Total job time: <br />15.58 <br />Hours <br />Unit cost: S 1.262 /LCY Total job cost: <br />$25,695.21 <br />CIR•:• :j Cost 5sumatina Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.