Laserfiche WebLink
Page 1 of 2 <br />SCRAPER TEAiVI WORK <br />Task description: _ Replace `1opsoil from Stockpile F to TAHR Stations 16 to 40 <br />Site: Hayden Gulch Loadout Permit Action: RN4 Permit'Job #: C1992081 <br />PROJECT IDENTI)" ICATTON <br />Task ;r: 508 State: Colorado <br />Date: 1 /10 %2013 County: Routt <br />User: JLF <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: <br />- Dozer: <br />Cat 637G <br />XT n <br />Abbreviation: None <br />Filename: C081 -508 <br />COSTShiB basis: leer day <br />Support Equipment -Load Area: 1 NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: s Water Tanker, 10,000 Gal. <br />Cost Breakdo,, n: Scraner Work Team Sunnort Fnuinment Mnintenance Fmminment <br />Total work team cost/hour: $1,649.37 <br />MATERIAL QUANTITIES <br />Initial volume: 9,006 CCY Swell factor: 1.000 <br />Loose volume: 9,006 LCY <br />Source of estimated volume: Seneca II -W Permit Table 21 -3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 3.100 lbs /LCY <br />Material description: Eart':t - Loam <br />Ratrd Payload: 81.600 pounds <br />Payload Capacity: 39.86 LCY <br />Scraner Bowl (volume) Basis: <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: j — <br />{ _ _ Ownership cost/hour: j <br />I00 <br />5100.38 <br />_NA <br />NA <br />NA <br />25 <br />25 <br />NA NA NA $37.98 <br />$52.97 <br />r _ Operating cost/hour: I <br />$235.35 <br />I NA <br />NA j <br />NA <br />$16.94 <br />` $29.77 <br />Ripper op. cosifhour: <br />NA <br />NA <br />; NA i <br />NA <br />, $0.00 <br />$0.00 <br />Operator cost`hour: <br />530.02 <br />NA <br />{ NA <br />NA <br />j $27.55 <br />$21.17 <br />Unit Subtotals: <br />$365.75 <br />NA <br />NA <br />NA <br />' $82.46 <br />$103.91 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />Group Subtotals: j <br />Work <br />$1,463.00 <br />r Support: <br />$0.00 <br />Maint: <br />$186.37 <br />Total work team cost/hour: $1,649.37 <br />MATERIAL QUANTITIES <br />Initial volume: 9,006 CCY Swell factor: 1.000 <br />Loose volume: 9,006 LCY <br />Source of estimated volume: Seneca II -W Permit Table 21 -3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 3.100 lbs /LCY <br />Material description: Eart':t - Loam <br />Ratrd Payload: 81.600 pounds <br />Payload Capacity: 39.86 LCY <br />Scraner Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />Heaped Volume: <br />34.00 <br />Average Volume: <br />29.00 <br />Adjusted Capacity: <br />29.00 <br />LCY <br />LCY <br />LCY <br />LCY <br />