My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-17_PERMIT FILE - C1992081 (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2013-12-17_PERMIT FILE - C1992081 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:08 PM
Creation date
1/30/2014 8:49:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
12/17/2013
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Wi} : <br />n ,beet t'. n ntr'd Task 508 Page 2 of 2 <br />cycle - F-inie: <br />Scraper Loading'1'ime: 1.00 Minutes <br />Maneuver and Spread '1'inie: 0.60 Minutes <br />Job Condition Correction: Site Altitude: 7500 feet <br />âTâ <br />Haul Distance (Ft) Grade ` <br />Roll. Res Total Res <br />Scraper i <br />Push Dozer <br />Source <br />Altitude Ad': <br />I.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />` NA <br />(CAT HB) <br />1 1.37 <br />Return Time: <br />137 <br />Net Correction: <br />0.830 <br />NA <br />4.50 <br />Travel Time: <br />Adjusted for job conditions: <br />Road Condition: <br />Firm, smooth. rolling. dirt/It. surfaced. watered, maintained 3.0 <br />Haul Route: <br />Selected Number of Scrapers: <br />2 <br />Haul Time: 1.53 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) Grade ` <br />Roll. Res Total Res <br />Velocity (fpm) <br />Travel Time <br />( %) i <br />( %) (%) <br />I (nun) <br />1 <br />3600.00 1 0.00 <br />3.00 3.00 1 <br />2949 <br />1 1.37 <br />Return Time: <br />137 <br />minutes <br />Total Scraper team cycle time: <br />4.50 <br />minutes <br />Adjusted for job conditions: <br />641.87 <br />LCY %Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />641.87 <br />LCY /Hour <br />Adjusted multiple scraper <br />team (beet) hourly production: <br />1,283.73 <br />LCY /Hour <br />Unadjusted unit production/hour: <br />773.33 LCY /Hour <br />Optimal Number of Scrapers per push dozer: <br />,DOB TIME AND COST <br />Fleet size: 2 Team(s) <br />Total job time: <br />7.02 <br />Hours <br />Unit cost: $1.285 %LCY <br />Total job cost: <br />$11,571.12 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.