My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-17_PERMIT FILE - C1992081 (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2013-12-17_PERMIT FILE - C1992081 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:08 PM
Creation date
1/30/2014 8:49:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
12/17/2013
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile G to TAHR Stations 0 to 16 <br />Site: Hayden gulch Loadout Permit Action: RN4 Permit/Joblm: C1992081 <br />PROJECT IDENTIFICATION <br />Task 4: 509 State: Colorado <br />Date: 1!10;2013 County: Routt <br />User: JL.E <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT <br />- Scraper: 1 Cat 637G <br />-Dozer. ; NA <br />Abbreviation: None <br />Filename: C081 -509 <br />COSTShift basis: jeer day <br />Support Equipment -Load Area: ! NA <br />-Dump Area: ( NA <br />Road Maintenance —Motor Grader: ' CAT 14M <br />-Water Truck Water Tanker, 10,000 Gal. <br />!•..ter n, . 1 Anon• Ql•rn- Ulnrlr Team C,ennnrt Prminment Maintenance Fouinment <br />Total work team costihour: $1.649.37 <br />MATERIAL OUANTITIES <br />Initial volume: 6.461 CCY Swell factor: 1.000 <br />Loose volume: 6,461 LCY <br />Source of estimated volume: Seneca 11 -W Permit Table 21 -3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />1 Load Area <br />Dump Area i <br />i <br />Motor Grader f <br />Water Truck i <br />j %Utilization- machine: <br />100 <br />NA <br />NA <br />NA i <br />25 j <br />25 <br />Ownership cost/hour: '; <br />$100.38 <br />NA <br />j NA <br />NA <br />$37.98 <br />552.97 <br />Operating costdhour. j <br />$23535 <br />NA <br />NA <br />NA <br />$16.94 j <br />529.77 <br />Ripper op._cost/hour: <br />Operator costilhour: ' <br />NA <br />$30.02 <br />NA_ <br />NA <br />NA <br />$0.00 ; <br />50.00 <br />NA NA NA $37.55 i <br />521.17 <br />Unit Subtotals: <br />$365.75 <br />NA <br />; NA <br />NA I <br />$82.46 i <br />$103.91 <br />Number of Units: <br />4 <br />0 <br />j 0 <br />0 <br />1 <br />1 <br />Group Subtotals: i <br />Work: <br />$1.463.00 <br />Support: j <br />$0.00 <br />Maint: <br />$186.37 <br />Total work team costihour: $1.649.37 <br />MATERIAL OUANTITIES <br />Initial volume: 6.461 CCY Swell factor: 1.000 <br />Loose volume: 6,461 LCY <br />Source of estimated volume: Seneca 11 -W Permit Table 21 -3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,100 lbs,/ LCY <br />Material description: <br />Earth - Loam_ <br />Rated Nyload: <br />81.600 pounds <br />Paylofid Capacity: <br />38.861 ICY -- <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />_ LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating SOIhValt <br />
The URL can be used to link to this page
Your browser does not support the video tag.